Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 124 | 50 | 11.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 60 | |
| 123 | 375 | 11.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 60 | |
| 122 | 230 | 18.00 | 1220.00 | 2440.00 | FM E2 LKL C11 7 | 0 / 19 | |
| 121 | 234 | 18.00 | 1220.00 | 2440.00 | FM E2 LKL C11 7 | 0 / 23 | |
| 120 | 999 | 6.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 100 | |
| 119 | 136 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 | |
| 118 | 111 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 | |
| 117 | 114 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 | |
| 116 | 106 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 | |
| 115 | 107 | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 200 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 408 | 396 | 2026-09-10 | M:September / W:37 | 663 | Shift B | P1.CU.2 | 2.70 x 1220.00 x 2440.00 | FA E1 UTY | 204 | P:0 / B:204 | O:0 / B:204 | 0.006549 | 1.335988 | Del |
| 407 | 395 | 2026-09-10 | M:September / W:37 | 623 | Shift B | P1.CU.1 | 2.70 x 1220.00 x 2440.00 | FA E1 UTY | 202 | P:0 / B:202 | O:0 / B:202 | 0.006549 | 1.322890 | Del |
| 406 | 394 | 2026-09-10 | M:September / W:37 | 658 | Shift B | P1.CU.2 | 2.70 x 1220.00 x 2440.00 | FA E1 UTY | 204 | P:0 / B:204 | O:0 / B:204 | 0.006549 | 1.335988 | Del |
| 405 | 393 | 2026-09-11 | M:September / W:37 | 616 | Shift A | P1.CU.1 | 11.60 x 915.00 x 1830.00 | FA B4 G2 | 55 | P:13 / B:42 | O:0 / B:42 | 0.017749 | 0.976204 | Del |
| 404 | 392 | 2026-09-11 | M:September / W:37 | 612 | Shift A | P1.CU.2 | 11.60 x 915.00 x 1830.00 | FA B4 G2 | 50 | P:0 / B:50 | O:0 / B:50 | 0.017749 | 0.887459 | Del |
| 403 | 391 | 2026-09-11 | M:September / W:37 | 617 | Shift A | P1.CU.1 | 11.60 x 915.00 x 1830.00 | FA B4 G2 | 62 | P:8 / B:54 | O:0 / B:54 | 0.017749 | 1.100449 | Del |
| 402 | 390 | 2026-09-10 | M:September / W:37 | 530 | Shift B | P1.CU.1 | 20.50 x 1220.00 x 2440.00 | MA B4 G1 | 18 | P:0 / B:18 | O:0 / B:18 | 0.058048 | 1.044857 | Del |
| 401 | 389 | 2026-09-10 | M:September / W:37 | x | Shift B | P1.CU.2 | 11.20 x 1220.00 x 2440.00 | FM E1 BB CC | 12 | P:1 / B:11 | O:0 / B:11 | 0.030363 | 0.364360 | Del |
| 400 | 388 | 2026-09-10 | M:September / W:37 | 105 | Shift B | P1.CU.2 | 11.20 x 1220.00 x 2440.00 | FM E1 BB CC | 40 | P:0 / B:40 | O:0 / B:40 | 0.030363 | 1.214534 | Del |
| 399 | 387 | 2026-09-10 | M:September / W:37 | 579 | Shift B | P1.CU.2 | 11.20 x 1220.00 x 2440.00 | FM E1 BB CC | 45 | P:0 / B:45 | O:45 / B:0 | 0.030363 | 1.366351 | Del |