Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
144 328 17.60 1230.00 2440.00 MA B4 G1 0 / 40
143 230 18.00 1220.00 2440.00 FM E2 LKL C11 7 0 / 30
142 385 3.70 1230.00 2440.00 FM B4 G1 0 / 200
141 254 3.70 1230.00 2440.00 FM B4 G1 0 / 200
140 147 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
139 181 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
138 8308 3.70 1230.00 2440.00 FM B4 G1 0 / 200
137 374 14.60 915.00 1830.00 MA B4 G1 0 / 37
136 403 11.60 915.00 1830.00 FA B4 G2 0 / 60
135 402 11.60 915.00 1830.00 FA B4 G2 0 / 60

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
398 386 2026-09-10 M:September / W:37 632 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:2 / B:198 O:0 / B:198 0.006549 1.309792 Del
397 385 2026-09-10 M:September / W:37 624 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 202 P:4 / B:198 O:198 / B:0 0.006549 1.322890 Del
396 384 2026-09-10 M:September / W:37 622 Shift A P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 202 P:2 / B:200 O:0 / B:200 0.006549 1.322890 Del
395 383 2026-09-10 M:September / W:37 621 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
394 382 2026-09-10 M:September / W:37 641 Shift A P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:4 / B:196 O:0 / B:196 0.006549 1.309792 Del
393 381 2026-09-10 M:September / W:37 498 Shift B P1.CU.2 20.50 x 1220.00 x 2440.00 MA B4 G1 20 P:0 / B:20 O:0 / B:20 0.058048 1.160952 Del
392 380 2026-09-10 M:September / W:37 60 Shift B P1.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 12 P:1 / B:11 O:0 / B:11 0.050606 0.607267 Del
391 379 2026-09-10 M:September / W:37 x Shift A P1.CU.2 14.60 x 1220.00 x 2440.00 MA B4 G1 50 P:11 / B:39 O:0 / B:39 0.040484 2.024224 Del
390 378 2026-09-10 M:September / W:37 628 Shift A P1.CU.1 14.60 x 1220.00 x 2440.00 MA B4 G1 35 P:22 / B:13 O:0 / B:13 0.040484 1.416957 Del
389 377 2026-09-10 M:September / W:37 636//628 Shift A P1.CU.1 14.60 x 1220.00 x 2440.00 MA B4 G1 40 P:21 / B:19 O:0 / B:19 0.040484 1.619379 Del