Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
367 x 15.00 1220.00 2440.00 FA B4 CI 17 0 / 38
366 X 8.20 1220.00 2440.00 FM E1 0 / 78
365 471//476 15.00 1220.00 2440.00 FA B4 CI 17 50 / 50
364 382//472// 15.00 1220.00 2440.00 FA B4 CI 17 4 / 41
363 940 8.20 1220.00 2440.00 FM E1 BB CC 0 / 47
362 123 2.40 915.00 1830.00 FM E1 UTY E 0 / 184
361 x 11.60 915.00 1830.00 FA B4 G2 6 / 8
360 55 5.00 910.00 1830.00 FM E2 LKL C11 7 0 / 96
359 120 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 101
358 415 18.00 1220.00 2440.00 FM E2 LKL C11 7 0 / 30
Total: 536 data
< Prev Halaman 21 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
109 337 2026-09-02 M:9 / W:36 x Shift A P2.CU.1 8.60 x 915.00 x 1830.00 MA B4 G2 14 P:0 / B:14 O:0 / B:0 0.012726 0.178161 Del
108 338 2026-09-02 M:9 / W:36 x Shift A P2.CU.1 8.60 x 915.00 x 1830.00 MA B4 G2 7 P:0 / B:7 O:0 / B:0 0.012726 0.089081 Del
107 30 2026-09-02 M:9 / W:36 279 Shift A P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 21 P:0 / B:21 O:0 / B:29 0.041675 0.875179 Del
104 56 2026-09-02 M:9 / W:36 364 Shift A P2.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 40 P:0 / B:40 O:40 / B:0 0.022897 0.915878 Del
100 334 2026-09-02 M:9 / W:36 126 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 186 P:3 / B:183 O:183 / B:14 0.003181 0.591751 Del
99 329 2026-09-02 M:9 / W:36 125 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 45 P:7 / B:38 O:38 / B:161 0.003181 0.143165 Del
98 333 2026-09-02 M:9 / W:36 8382 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 200 P:7 / B:193 O:60 / B:7 0.009604 1.920768 Del
97 70 2026-09-02 M:9 / W:36 385 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 27 P:5 / B:22 O:22 / B:151 0.009604 0.259304 Del
96 332 2026-09-01 M:9 / W:36 319//323 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 MA B4 G1 43 P:4 / B:39 O:39 / B:0 0.031813 1.367947 Del
94 331 2026-09-01 M:9 / W:36 124 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 38 P:0 / B:38 O:38 / B:153 0.003181 0.120895 Del