Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
407 712 18.00 1220.00 2440.00 FA E2 BB CC 0 / 30
406 587 18.00 1220.00 2440.00 MA B4 G1 0 / 35
405 539 17.60 1220.00 2440.00 MA B4 G1 0 / 40
404 580//538 17.60 1220.00 2440.00 MA B4 G1 0 / 40
403 574 17.60 920.00 2440.00 MA B4 G1 0 / 40
402 686 11.60 915.00 1830.00 FA B4 G2 0 / 37
401 696 11.60 915.00 1830.00 FA B4 G2 0 / 40
400 613 11.60 915.00 1830.00 FA B4 G2 0 / 60
399 592 18.00 1220.00 2440.00 FA E2 BB CC 0 / 35
398 647 2.70 1220.00 2440.00 FA E1 UTY 0 / 196

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
413 401 2026-09-11 M:September / W:37 696 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 40 P:1 / B:39 O:0 / B:39 0.017749 0.709967 Del
412 400 2026-09-11 M:September / W:37 613 Shift A P1.CU.2 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
411 399 2026-09-10 M:September / W:37 592 Shift B P1.CU.3 18.00 x 1220.00 x 2440.00 FA E2 BB CC 35 P:0 / B:35 O:0 / B:35 0.050606 1.771196 Del
410 398 2026-09-10 M:September / W:37 647 Shift B P1.CU.3 2.70 x 1220.00 x 2440.00 FA E1 UTY 196 P:0 / B:196 O:196 / B:0 0.006549 1.283596 Del
408 396 2026-09-10 M:September / W:37 663 Shift B P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 204 P:0 / B:204 O:0 / B:204 0.006549 1.335988 Del
407 395 2026-09-10 M:September / W:37 623 Shift B P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 202 P:0 / B:202 O:0 / B:202 0.006549 1.322890 Del
406 394 2026-09-10 M:September / W:37 658 Shift B P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 204 P:0 / B:204 O:0 / B:204 0.006549 1.335988 Del
405 393 2026-09-11 M:September / W:37 616 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 55 P:13 / B:42 O:0 / B:42 0.017749 0.976204 Del
404 392 2026-09-11 M:September / W:37 612 Shift A P1.CU.2 11.60 x 915.00 x 1830.00 FA B4 G2 50 P:0 / B:50 O:0 / B:50 0.017749 0.887459 Del
403 391 2026-09-11 M:September / W:37 617 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 62 P:8 / B:54 O:0 / B:54 0.017749 1.100449 Del