Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
672 734//850 14.60 915.00 1830.00 MA B4 G1 0 / 50
671 850//873 14.60 915.00 1830.00 MA B4 G1 0 / 50
670 873 14.60 915.00 1830.00 MA B4 G1 0 / 38
669 864 14.60 915.00 1830.00 MA B4 G1 0 / 42
668 935 14.60 915.00 1830.00 MA B4 G1 0 / 50
667 906//878 14.60 915.00 1830.00 MA B4 G1 0 / 50
666 917//916 8.60 1220.00 2440.00 MA B4 G1 0 / 80
665 x 18.00 1220.00 2440.00 FM E1 UTY E 0 / 20
664 906 14.60 915.00 1830.00 MA B4 G1 0 / 50
663 890//x 8.60 1220.00 2440.00 MA B4 G1 0 / 80

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
402 390 2026-09-10 M:September / W:37 530 Shift B P1.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 18 P:0 / B:18 O:0 / B:18 0.058048 1.044857 Del
401 389 2026-09-10 M:September / W:37 x Shift B P1.CU.2 11.20 x 1220.00 x 2440.00 FM E1 BB CC 12 P:1 / B:11 O:0 / B:11 0.030363 0.364360 Del
400 388 2026-09-10 M:September / W:37 105 Shift B P1.CU.2 11.20 x 1220.00 x 2440.00 FM E1 BB CC 40 P:0 / B:40 O:0 / B:40 0.030363 1.214534 Del
399 387 2026-09-10 M:September / W:37 579 Shift B P1.CU.2 11.20 x 1220.00 x 2440.00 FM E1 BB CC 45 P:0 / B:45 O:45 / B:0 0.030363 1.366351 Del
398 386 2026-09-10 M:September / W:37 632 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:2 / B:198 O:0 / B:198 0.006549 1.309792 Del
397 385 2026-09-10 M:September / W:37 624 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 202 P:4 / B:198 O:198 / B:0 0.006549 1.322890 Del
396 384 2026-09-10 M:September / W:37 622 Shift A P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 202 P:2 / B:200 O:0 / B:200 0.006549 1.322890 Del
395 383 2026-09-10 M:September / W:37 621 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
394 382 2026-09-10 M:September / W:37 641 Shift A P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:4 / B:196 O:0 / B:196 0.006549 1.309792 Del
393 381 2026-09-10 M:September / W:37 498 Shift B P1.CU.2 20.50 x 1220.00 x 2440.00 MA B4 G1 20 P:0 / B:20 O:0 / B:20 0.058048 1.160952 Del