Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
336 591 5.00 1220.00 2440.00 FA E2 CI D2 0 / 76
335 483//491 18.00 1220.00 2440.00 FM E1 UTY E 0 / 40
334 x//301 18.00 1220.00 2440.00 FM E1 UTY E 0 / 31
333 456/x 18.00 1220.00 2440.00 FM E1 UTY E 0 / 32
332 548 5.00 1220.00 2440.00 FA E2 CI D2 0 / 100
331 594 5.00 1220.00 2440.00 FA E2 CI D2 0 / 107
330 595 2.70 1220.00 2440.00 FA E2 CI D2 0 / 200
329 608 2.70 1220.00 2440.00 FA E2 CI D2 0 / 200
328 531 2.70 1220.00 2440.00 FA E2 CI D2 0 / 220
327 603 2.70 1220.00 2440.00 FA E2 CI D2 0 / 200

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
392 380 2026-09-10 M:September / W:37 60 Shift B P1.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 12 P:1 / B:11 O:0 / B:11 0.050606 0.607267 Del
391 379 2026-09-10 M:September / W:37 x Shift A P1.CU.2 14.60 x 1220.00 x 2440.00 MA B4 G1 50 P:11 / B:39 O:0 / B:39 0.040484 2.024224 Del
390 378 2026-09-10 M:September / W:37 628 Shift A P1.CU.1 14.60 x 1220.00 x 2440.00 MA B4 G1 35 P:22 / B:13 O:0 / B:13 0.040484 1.416957 Del
389 377 2026-09-10 M:September / W:37 636//628 Shift A P1.CU.1 14.60 x 1220.00 x 2440.00 MA B4 G1 40 P:21 / B:19 O:0 / B:19 0.040484 1.619379 Del
388 376 2026-09-10 M:September / W:37 x Shift A P1.CU.1 17.60 x 915.00 x 1830.00 MA B4 G2 3 P:0 / B:3 O:0 / B:3 0.027796 0.083388 Del
387 375 2026-09-09 M:September / W:37 x Shift B P1.CU.1 20.50 x 915.00 x 1830.00 MA B4 G2 3 P:0 / B:3 O:0 / B:3 0.032652 0.097955 Del
386 374 2026-09-09 M:September / W:37 x Shift A P1.CU.1 14.60 x 915.00 x 1830.00 MA B4 G1 12 P:0 / B:12 O:12 / B:0 0.022773 0.273270 Del
385 373 2026-09-09 M:September / W:37 x Shift B P1.CU.2 20.50 x 915.00 x 1830.00 MA B4 G2 15 P:0 / B:15 O:0 / B:15 0.032652 0.489777 Del
384 372 2026-09-09 M:September / W:37 x Shift A P1.CU.1 14.60 x 915.00 x 1830.00 MA B4 G1 12 P:0 / B:12 O:0 / B:12 0.022773 0.273270 Del
383 371 2026-09-09 M:September / W:37 x Shift A P1.CU.1 14.60 x 915.00 x 1830.00 MA B4 G1 29 P:0 / B:29 O:0 / B:29 0.022773 0.660403 Del