Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
196 418 2.70 915.00 1830.00 FJB E1 UTY E 0 / 200
195 428 2.70 915.00 1830.00 FJB E1 UTY E 0 / 164
194 481 2.70 915.00 1830.00 FJB E1 UTY E 0 / 200
193 470//480 2.70 915.00 1830.00 FJB E1 UTY E 0 / 196
192 370//470 2.70 915.00 1830.00 FJB E1 UTY E 0 / 190
191 453/x 11.60 1230.00 2440.00 FA B4 G2 0 / 60
190 454//453 11.60 1230.00 2440.00 FA B4 G2 0 / 60
189 454 11.60 1230.00 2440.00 FA B4 G2 0 / 60
188 457 11.60 1230.00 2440.00 FA B4 G2 0 / 53
187 482 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
392 380 2026-09-10 M:September / W:37 60 Shift B P1.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 12 P:1 / B:11 O:0 / B:11 0.050606 0.607267 Del
391 379 2026-09-10 M:September / W:37 x Shift A P1.CU.2 14.60 x 1220.00 x 2440.00 MA B4 G1 50 P:11 / B:39 O:0 / B:39 0.040484 2.024224 Del
390 378 2026-09-10 M:September / W:37 628 Shift A P1.CU.1 14.60 x 1220.00 x 2440.00 MA B4 G1 35 P:22 / B:13 O:0 / B:13 0.040484 1.416957 Del
389 377 2026-09-10 M:September / W:37 636//628 Shift A P1.CU.1 14.60 x 1220.00 x 2440.00 MA B4 G1 40 P:21 / B:19 O:0 / B:19 0.040484 1.619379 Del
388 376 2026-09-10 M:September / W:37 x Shift A P1.CU.1 17.60 x 915.00 x 1830.00 MA B4 G2 3 P:0 / B:3 O:0 / B:3 0.027796 0.083388 Del
387 375 2026-09-09 M:September / W:37 x Shift B P1.CU.1 20.50 x 915.00 x 1830.00 MA B4 G2 3 P:0 / B:3 O:0 / B:3 0.032652 0.097955 Del
386 374 2026-09-09 M:September / W:37 x Shift A P1.CU.1 14.60 x 915.00 x 1830.00 MA B4 G1 12 P:0 / B:12 O:12 / B:0 0.022773 0.273270 Del
385 373 2026-09-09 M:September / W:37 x Shift B P1.CU.2 20.50 x 915.00 x 1830.00 MA B4 G2 15 P:0 / B:15 O:0 / B:15 0.032652 0.489777 Del
384 372 2026-09-09 M:September / W:37 x Shift A P1.CU.1 14.60 x 915.00 x 1830.00 MA B4 G1 12 P:0 / B:12 O:0 / B:12 0.022773 0.273270 Del
383 371 2026-09-09 M:September / W:37 x Shift A P1.CU.1 14.60 x 915.00 x 1830.00 MA B4 G1 29 P:0 / B:29 O:0 / B:29 0.022773 0.660403 Del