Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
367 x 15.00 1220.00 2440.00 FA B4 CI 17 0 / 38
366 X 8.20 1220.00 2440.00 FM E1 0 / 78
365 471//476 15.00 1220.00 2440.00 FA B4 CI 17 50 / 50
364 382//472// 15.00 1220.00 2440.00 FA B4 CI 17 4 / 41
363 940 8.20 1220.00 2440.00 FM E1 BB CC 0 / 47
362 123 2.40 915.00 1830.00 FM E1 UTY E 0 / 184
361 x 11.60 915.00 1830.00 FA B4 G2 6 / 8
360 55 5.00 910.00 1830.00 FM E2 LKL C11 7 0 / 96
359 120 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 101
358 415 18.00 1220.00 2440.00 FM E2 LKL C11 7 0 / 30
Total: 536 data
< Prev Halaman 21 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
67 323 2026-09-08 M:9 / W:37 939 Shift B P2.CU.3 8.20 x 1220.00 x 2440.00 FM E1 BB CC 23 P:5 / B:18 O:18 / B:47 0.021433 0.492958 Del
63 166 2026-09-08 M:9 / W:37 542 Shift A P2.CU.1 5.00 x 1220.00 x 2440.00 FA E2 CI D2 90 P:0 / B:90 O:90 / B:0 0.011907 1.071648 Del
62 140 2026-09-07 M:9 / W:37 x Shift A P2.CU.2 3.70 x 1220.00 x 2440.00 FM B4 G1 67 P:16 / B:51 O:51 / B:116 0.009526 0.638226 Del
61 322 2026-09-07 M:9 / W:37 454 Shift B P2.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:4 / B:56 O:56 / B:0 0.031813 1.908763 Del
60 273 2026-09-07 M:9 / W:37 476 Shift A P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 16 P:0 / B:16 O:16 / B:15 0.041675 0.666803 Del
59 154 2026-09-07 M:9 / W:37 478//471 Shift A P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 50 P:0 / B:50 O:50 / B:0 0.041675 2.083760 Del
57 321 2026-09-07 M:9 / W:37 510 Shift A P2.CU.1 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:60 / B:0 0.017556 1.053343 Del
54 285 2026-09-07 M:9 / W:37 430 Shift A P2.CU.1 11.60 x 1220.00 x 2440.00 FA B4 G2 51 P:3 / B:48 O:48 / B:0 0.031554 1.609258 Del
53 320 2026-09-07 M:9 / W:37 354 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 40 P:4 / B:36 O:37 / B:0 0.031813 1.272509 Del
51 287 2026-09-07 M:9 / W:37 67 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 79 P:3 / B:76 O:76 / B:0 0.031813 2.513205 Del