Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
435 569 2.70 1220.00 2440.00 FA E1 UTY 196 / 196
434 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 6
433 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 198
432 x 2.70 1220.00 2440.00 FA E2 D1 D2 0 / 199
431 780 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
429 775 15.00 920.00 2440.00 FA B4 CI 17 0 / 50
428 707 18.00 1220.00 2440.00 FA E2 BB CC 0 / 40
427 708 18.00 1220.00 2440.00 FA E2 BB CC 0 / 34
426 513 2.70 1220.00 2440.00 FA E1 UTY 165 / 200
425 715//714 6.00 1220.00 2440.00 FA B4 BB CC 0 / 65
Total: 521 data
< Prev Halaman 13 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
197 76 2026-09-04 M:9 / W:36 8308 Shift A P2.CU.1 3.70 x 1230.00 x 2440.00 FM B4 G1 102 P:54 / B:48 O:0 / B:98 0.009604 0.979592 Del
196 113 2026-09-04 M:9 / W:36 429 Shift A P2.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 41 P:5 / B:36 O:0 / B:0 0.017556 0.719785 Del
195 74 2026-09-04 M:9 / W:36 341 Shift B P2.CU.4 11.60 x 1230.00 x 2440.00 FA B4 G2 9 P:0 / B:9 O:0 / B:49 0.031813 0.286314 Del
194 281 2026-09-04 M:9 / W:36 337 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 14 P:4 / B:10 O:0 / B:25 0.031813 0.445378 Del
193 110 2026-09-04 M:9 / W:36 366 Shift B P2.CU.4 2.70 x 915.00 x 1830.00 FJB E1 UTY E 200 P:23 / B:177 O:0 / B:0 0.003684 0.736758 Del
192 108 2026-09-04 M:9 / W:36 408 Shift B P2.CU.4 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:1 / B:59 O:0 / B:0 0.017749 1.064950 Del
191 77 2026-09-04 M:9 / W:36 375 Shift B P2.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:2 / B:58 O:0 / B:0 0.017749 1.064950 Del
190 78 2026-09-04 M:9 / W:36 359 Shift B P2.CU.5 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:0 0.017749 1.064950 Del
189 96 2026-09-04 M:9 / W:36 386 Shift A P2.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 13 P:0 / B:13 O:0 / B:47 0.017749 0.230739 Del
188 350 2026-09-04 M:9 / W:36 244 Shift B P2.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 64 P:0 / B:64 O:0 / B:0 0.017749 1.135947 Del