Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
720 x 14.20 1220.00 2440.00 FM E1 0 / 4
719 x 17.20 1220.00 2440.00 FM E1 0 / 7
718 x 8.20 1220.00 2440.00 FM E1 0 / 51
717 564 20.50 1220.00 2440.00 MA B4 G1 0 / 30
716 415 18.00 1220.00 2440.00 FM E2 LKL C11 7 0 / 30
715 X 20.50 1220.00 2440.00 MA B4 G1 0 / 5
714 x//798 8.60 915.00 1830.00 MA B4 G1 0 / 80
713 x 18.00 1220.00 2440.00 FM E1 UTY E 0 / 13
712 X 18.00 1220.00 2440.00 FA E2 CI D2 0 / 12
711 X 18.00 1220.00 2440.00 FA B4 G1 0 / 9

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
338 323 2026-09-08 M:September / W:37 517 Shift B P1.CU.1 5.00 x 1220.00 x 2440.00 FA E2 CI D2 65 P:1 / B:64 O:0 / B:64 0.011907 0.773968 Del
337 322 2026-09-08 M:September / W:37 591//517 Shift B P1.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 48 P:0 / B:48 O:0 / B:48 0.011907 0.571546 Del
336 321 2026-09-08 M:September / W:37 522 Shift B P1.CU.1 5.00 x 1220.00 x 2440.00 FA E2 CI D2 104 P:0 / B:104 O:0 / B:104 0.011907 1.238349 Del
335 320 2026-09-08 M:September / W:37 504 Shift A P1.CU.1 5.00 x 1220.00 x 2440.00 FA E2 CI D2 72 P:5 / B:67 O:0 / B:67 0.011907 0.857318 Del
334 319 2026-09-08 M:September / W:37 52//29 Shift A P1.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 20 P:0 / B:20 O:0 / B:20 0.050606 1.012112 Del
333 318 2026-09-08 M:September / W:37 556 Shift A P1.CU.2 20.50 x 1220.00 x 2440.00 MA B4 G1 35 P:5 / B:30 O:0 / B:30 0.058048 2.031666 Del
332 317 2026-09-08 M:September / W:37 515 Shift A P1.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 26 P:1 / B:25 O:0 / B:25 0.058048 1.509238 Del
331 316 2026-09-08 M:September / W:37 521 Shift B P1.CU.2 20.50 x 1220.00 x 2440.00 MA B4 G1 30 P:0 / B:30 O:0 / B:30 0.058048 1.741428 Del
330 315 2026-09-08 M:September / W:37 531 Shift B P1.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 36 P:0 / B:36 O:0 / B:36 0.058048 2.089714 Del
329 314 2026-09-08 M:September / W:37 575 Shift A P1.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 33 P:0 / B:33 O:0 / B:33 0.058048 1.915571 Del