Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
559 870 11.60 915.00 1830.00 FA B4 G2 0 / 38
558 861//705 11.60 915.00 1830.00 FA B4 G2 0 / 60
557 842 11.60 915.00 1830.00 FA B4 G2 0 / 62
556 818 11.60 915.00 1830.00 FA B4 G2 0 / 60
555 860 11.60 915.00 1830.00 FA B4 G2 0 / 59
554 705 11.60 915.00 1830.00 FA B4 G2 0 / 43
553 844 11.60 915.00 1830.00 FA B4 G2 0 / 60
552 832 11.60 915.00 1830.00 FA B4 G2 0 / 60
551 833 11.60 915.00 1830.00 FA B4 G2 0 / 60
550 719 11.60 915.00 1830.00 FA B4 G2 60 / 60

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
362 347 2026-09-09 M:September / W:37 525 Shift B P1.CU.2 6.00 x 1220.00 x 2440.00 FA B4 BB CC 80 P:0 / B:80 O:0 / B:80 0.014884 1.190720 Del
361 346 2026-09-10 M:September / W:37 x Shift A P1.CU.2 8.60 x 915.00 x 1830.00 MA B4 G2 14 P:0 / B:14 O:14 / B:0 0.012726 0.178161 Del
360 345 2026-09-10 M:September / W:37 x Shift A P1.CU.1 8.60 x 915.00 x 1830.00 MA B4 G2 7 P:0 / B:7 O:7 / B:0 0.012726 0.089081 Del
359 344 2026-09-09 M:September / W:37 605//525 Shift B P1.CU.2 6.00 x 1220.00 x 2440.00 FA B4 BB CC 67 P:2 / B:65 O:0 / B:65 0.014884 0.997228 Del
358 343 2026-09-09 M:September / W:37 525 Shift B P1.CU.1 6.00 x 1220.00 x 2440.00 FA B4 BB CC 60 P:3 / B:57 O:0 / B:57 0.014884 0.893040 Del
357 342 2026-09-10 M:September / W:37 615 Shift A P1.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 110 P:2 / B:108 O:0 / B:108 0.011907 1.309792 Del
356 341 2026-09-10 M:September / W:37 614 Shift A P1.CU.1 5.00 x 1220.00 x 2440.00 FA E2 CI D2 110 P:12 / B:98 O:0 / B:98 0.011907 1.309792 Del
355 340 2026-09-10 M:September / W:37 361 Shift A P1.CU.1 9.00 x 1220.00 x 2440.00 FA E2 CI D2 31 P:0 / B:31 O:0 / B:31 0.023814 0.738246 Del
354 339 2026-09-09 M:September / W:37 x Shift A P1.CU.1 9.00 x 1220.00 x 2440.00 FA B4 BB CC LU DRI P 17 P:0 / B:17 O:0 / B:17 0.023814 0.404845 Del
353 338 2026-09-09 M:September / W:37 x Shift B P1.CU.1 9.00 x 1220.00 x 2440.00 FM E2 CI 17 59 P:0 / B:59 O:0 / B:59 0.023814 1.405050 Del