Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
527 60 18.00 1220.00 2440.00 FM E2 CI 17 34 / 34
526 48 18.00 1220.00 2440.00 FM E2 CI 17 0 / 27
525 571 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
524 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
523 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 198
522 569 2.70 1220.00 2440.00 FA E1 UTY 0 / 196
521 739 15.00 1220.00 2440.00 FA B4 CI 17 36 / 36
520 762 14.60 920.00 2440.00 FA B4 CI 17 0 / 30
519 x 11.60 1220.00 2440.00 MA B4 G1 0 / 46
518 665 11.60 1220.00 2440.00 MA B4 G1 0 / 37

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
695 699 2026-09-19 M:9 / W:38 957 Shift A P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 35 P:0 / B:35 O:35 / B:0 0.041675 1.458632 Del
694 686 2026-09-19 M:9 / W:38 851 Shift A P1.CU.7 8.60 x 915.00 x 1830.00 MA B4 G1 70 P:1 / B:69 O:69 / B:0 0.012726 0.890807 Del
693 715 2026-09-19 M:9 / W:38 X Shift A P1.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 5 P:0 / B:5 O:5 / B:0 0.058048 0.290238 Del
692 704 2026-09-19 M:9 / W:38 X Shift A P1.CU.4 14.60 x 1220.00 x 2440.00 MA B4 G1 11 P:0 / B:11 O:11 / B:0 0.040484 0.445329 Del
691 707 2026-09-19 M:9 / W:38 X Shift A P1.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 7 P:0 / B:7 O:7 / B:0 0.058048 0.406333 Del
690 708 2026-09-19 M:9 / W:38 X Shift A P1.CU.2 8.60 x 1220.00 x 2440.00 FA B4 G1 16 P:1 / B:15 O:0 / B:15 0.022624 0.361979 Del
689 701 2026-09-19 M:9 / W:38 X Shift A P1.CU.1 11.60 x 1220.00 x 2440.00 FA B4 G1 10 P:0 / B:10 O:0 / B:10 0.031554 0.315541 Del
688 692 2026-09-19 M:9 / W:38 868 Shift A P1.CU.2 8.60 x 915.00 x 1830.00 MA B4 G1 94 P:0 / B:94 O:94 / B:0 0.012726 1.196227 Del
687 691 2026-09-19 M:9 / W:38 x Shift A P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 38 P:0 / B:38 O:27 / B:11 0.041675 1.583658 Del
686 690 2026-09-19 M:9 / W:38 X Shift A P1.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 47 P:0 / B:47 O:47 / B:0 0.022773 1.070308 Del