Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 164 | 46 | 8.20 | 1220.00 | 2440.00 | FM E1 BB CC | 0 / 65 | |
| 163 | 811 | 9.00 | 1220.00 | 2440.00 | FA E2 UTY KRUING | 0 / 44 | |
| 162 | 330 | 9.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 80 | |
| 161 | 331 | 9.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 80 | |
| 160 | 367 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 159 | 369 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 180 | |
| 158 | 366 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 157 | 351 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 214 | |
| 156 | 336 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 155 | 346 | 20.50 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 31 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 328 | 313 | 2026-09-08 | M:September / W:37 | 221 | Shift A | P1.CU.1 | 18.00 x 1220.00 x 2440.00 | FM E1 UTY E | 17 | P:8 / B:9 | O:0 / B:9 | 0.050606 | 0.860295 | Del |
| 327 | 312 | 2026-09-08 | M:September / W:37 | 221 | Shift A | P1.CU.2 | 18.00 x 1220.00 x 2440.00 | FM E1 UTY E | 25 | P:9 / B:16 | O:0 / B:16 | 0.050606 | 1.265140 | Del |
| 326 | 311 | 2026-09-08 | M:September / W:37 | 600 | Shift B | P1.CU.1 | 15.00 x 1220.00 x 2440.00 | FM E1 UTY E | 50 | P:0 / B:50 | O:0 / B:50 | 0.041675 | 2.083760 | Del |
| 325 | 310 | 2026-09-08 | M:September / W:37 | 598 | Shift B | P1.CU.2 | 15.00 x 1220.00 x 2440.00 | FA E2 BB CC | 50 | P:3 / B:47 | O:0 / B:47 | 0.041675 | 2.083760 | Del |
| 324 | 309 | 2026-09-08 | M:September / W:37 | 599 | Shift B | P1.CU.2 | 15.00 x 1220.00 x 2440.00 | FA E2 BB CC | 50 | P:1 / B:49 | O:0 / B:49 | 0.041675 | 2.083760 | Del |
| 323 | 308 | 2026-09-08 | M:September / W:37 | x | Shift B | P1.CU.2 | 9.00 x 1220.00 x 2440.00 | FM E2 CI 17 | 42 | P:0 / B:42 | O:0 / B:42 | 0.023814 | 1.000205 | Del |
| 322 | 307 | 2026-09-07 | M:September / W:37 | 221//456 | Shift A | P1.CU.1 | 18.00 x 1220.00 x 2440.00 | FM E1 UTY E | 33 | P:0 / B:33 | O:0 / B:33 | 0.050606 | 1.669985 | Del |
| 321 | 306 | 2026-09-07 | M:September / W:37 | x | Shift A | P1.CU.3 | 2.70 x 915.00 x 1830.00 | FM E1 UTY E | 85 | P:0 / B:85 | O:0 / B:85 | 0.003684 | 0.313122 | Del |
| 320 | 305 | 2026-09-07 | M:September / W:37 | 582 | Shift B | P1.CU.1 | 2.70 x 1220.00 x 2440.00 | FA E2 CI D2 | 202 | P:0 / B:202 | O:0 / B:202 | 0.006549 | 1.322890 | Del |
| 319 | 304 | 2026-09-07 | M:September / W:37 | 508 | Shift B | P1.CU.1 | 2.70 x 1220.00 x 2440.00 | FA E2 CI D2 | 200 | P:0 / B:200 | O:0 / B:200 | 0.006549 | 1.309792 | Del |