Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
617 905 15.00 1220.00 2440.00 FA B4 CI 17 45 / 45
616 947 15.00 1220.00 2440.00 FA B4 CI 17 27 / 27
615 859 3.00 1220.00 2440.00 FA B4 BB CC 201 / 201
614 x 17.20 1220.00 2440.00 FM E1 7 / 7
613 923//x 11.60 1220.00 2440.00 MA B4 G1 22 / 22
612 665 11.60 1220.00 2440.00 MA B4 G1 37 / 37
611 910 15.00 1220.00 2440.00 FA B4 CI 17 50 / 50
610 924 11.60 1220.00 2440.00 MA B4 G1 60 / 60
609 923 11.60 1220.00 2440.00 MA B4 G1 53 / 53
608 944 11.60 1220.00 2440.00 MA B4 G1 60 / 60
Total: 536 data
< Prev Halaman 1 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
130 141 2026-09-02 M:9 / W:36 x Shift B P2.CU.3 3.70 x 1220.00 x 2440.00 FM B4 G1 23 P:0 / B:23 O:0 / B:50 0.009526 0.219092 Del
128 37 2026-09-02 M:9 / W:36 382 Shift A P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 22 P:0 / B:22 O:0 / B:0 0.041675 0.916854 Del
127 30 2026-09-02 M:9 / W:36 279 Shift B P2.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 29 P:0 / B:29 O:0 / B:21 0.041675 1.208581 Del
126 69 2026-09-02 M:9 / W:36 349 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 FA B4 G2 61 P:3 / B:58 O:0 / B:0 0.031813 1.940576 Del
124 82 2026-09-02 M:9 / W:36 50 Shift B P2.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:0 0.017749 1.064950 Del
123 79 2026-09-02 M:9 / W:36 381 Shift B P2.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 59 P:0 / B:59 O:0 / B:0 0.017749 1.047201 Del
121 59 2026-09-02 M:9 / W:36 297+368 Shift B P2.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 45 P:1 / B:44 O:0 / B:0 0.022897 1.030363 Del
120 90 2026-09-02 M:9 / W:36 x Shift A P2.CU.1 3.70 x 1230.00 x 2440.00 FM B4 G1,5 197 P:15 / B:182 O:0 / B:0 0.009604 1.891956 Del
119 73 2026-09-02 M:9 / W:36 342 Shift A P2.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 50 P:0 / B:50 O:0 / B:0 0.031813 1.590636 Del
118 72 2026-09-02 M:9 / W:36 343 Shift B P2.CU.3 11.60 x 1230.00 x 2440.00 FA B4 G2 59 P:0 / B:59 O:0 / B:0 0.031813 1.876950 Del