Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
607 843 11.60 915.00 1830.00 FA B4 G2 0 / 65
606 719//718 11.60 915.00 1830.00 FA B4 G2 0 / 61
605 604 11.60 915.00 1830.00 FA B4 G2 0 / 60
604 723 11.60 915.00 1830.00 FA B4 G2 0 / 35
603 468 18.00 1220.00 2440.00 FA E1 UTY 0 / 23
602 243 5.00 915.00 1830.00 FM E2 CI 17 0 / 53
601 662 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 46
600 710 5.00 920.00 2440.00 FM E1 UTY E 0 / 100
599 642 11.00 1220.00 2440.00 FM PENOL MAHONI 0 / 2
598 693//692 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 100

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
308 293 2026-09-08 M:September / W:37 29//593 Shift A P1.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 18 P:1 / B:17 O:0 / B:17 0.050606 0.910901 Del
307 292 2026-09-08 M:September / W:37 456//435 Shift A P1.CU.2 18.00 x 1220.00 x 2440.00 FM E1 UTY E 27 P:0 / B:27 O:0 / B:27 0.050606 1.366351 Del
306 291 2026-09-07 M:September / W:37 456 Shift B P1.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 23 P:0 / B:23 O:0 / B:23 0.050606 1.163929 Del
305 290 2026-09-07 M:September / W:37 145 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 120 P:0 / B:120 O:0 / B:120 0.003181 0.381775 Del
304 289 2026-09-07 M:September / W:37 128 Shift A P1.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:4 / B:196 O:0 / B:196 0.003181 0.636291 Del
303 288 2026-09-07 M:September / W:37 127 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 201 P:0 / B:201 O:0 / B:201 0.003181 0.639472 Del
302 287 2026-09-07 M:September / W:37 99 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 198 P:0 / B:198 O:0 / B:198 0.003181 0.629928 Del
301 286 2026-09-07 M:September / W:37 440//410 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 258 P:2 / B:256 O:0 / B:256 0.003181 0.820815 Del
300 285 2026-09-07 M:September / W:37 450//440 Shift A P1.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 178 P:2 / B:176 O:0 / B:176 0.003181 0.566299 Del
299 284 2026-09-08 M:September / W:37 561 Shift A P1.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 50 P:3 / B:47 O:0 / B:47 0.041675 2.083760 Del