Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
472 752 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
471 790 2.40 915.00 1830.00 FM E1 UTY E 200 / 200
470 870 11.60 915.00 1830.00 FA B4 G2 36 / 36
468 833 11.60 915.00 1830.00 FA B4 G2 60 / 60
467 745 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
466 698 6.00 1220.00 2440.00 FA B4 BB CC 0 / 50
465 784 2.40 915.00 1830.00 FM E1 UTY E 0 / 199
463 748 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
462 490 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
461 581 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
Total: 536 data
< Prev Halaman 11 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
113 58 2026-09-02 M:9 / W:36 372 Shift A P2.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:3 / B:47 O:0 / B:0 0.022897 1.144848 Del
112 60 2026-09-02 M:9 / W:36 371 Shift B P2.CU.2 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:1 / B:49 O:0 / B:0 0.022897 1.144848 Del
109 337 2026-09-02 M:9 / W:36 x Shift A P2.CU.1 8.60 x 915.00 x 1830.00 MA B4 G2 14 P:0 / B:14 O:0 / B:0 0.012726 0.178161 Del
108 338 2026-09-02 M:9 / W:36 x Shift A P2.CU.1 8.60 x 915.00 x 1830.00 MA B4 G2 7 P:0 / B:7 O:0 / B:0 0.012726 0.089081 Del
107 30 2026-09-02 M:9 / W:36 279 Shift A P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 21 P:0 / B:21 O:0 / B:29 0.041675 0.875179 Del
104 56 2026-09-02 M:9 / W:36 364 Shift A P2.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 40 P:0 / B:40 O:40 / B:0 0.022897 0.915878 Del
100 334 2026-09-02 M:9 / W:36 126 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 186 P:3 / B:183 O:183 / B:14 0.003181 0.591751 Del
99 329 2026-09-02 M:9 / W:36 125 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 45 P:7 / B:38 O:38 / B:161 0.003181 0.143165 Del
98 333 2026-09-02 M:9 / W:36 8382 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 200 P:7 / B:193 O:60 / B:7 0.009604 1.920768 Del
97 70 2026-09-02 M:9 / W:36 385 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 27 P:5 / B:22 O:22 / B:151 0.009604 0.259304 Del