Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
435 569 2.70 1220.00 2440.00 FA E1 UTY 196 / 196
434 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 6
433 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 198
432 x 2.70 1220.00 2440.00 FA E2 D1 D2 0 / 199
431 780 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
429 775 15.00 920.00 2440.00 FA B4 CI 17 0 / 50
428 707 18.00 1220.00 2440.00 FA E2 BB CC 0 / 40
427 708 18.00 1220.00 2440.00 FA E2 BB CC 0 / 34
426 513 2.70 1220.00 2440.00 FA E1 UTY 165 / 200
425 715//714 6.00 1220.00 2440.00 FA B4 BB CC 0 / 65
Total: 521 data
< Prev Halaman 13 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
156 344 2026-09-03 M:9 / W:36 379 Shift A P2.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 30 P:5 / B:25 O:0 / B:0 0.058048 1.741428 Del
155 343 2026-09-03 M:9 / W:36 417//377 Shift A P2.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 35 P:0 / B:35 O:0 / B:0 0.058048 2.031666 Del
153 341 2026-09-03 M:9 / W:36 X Shift A P2.CU.2 14.60 x 1220.00 x 2440.00 MA B4 G1 14 P:1 / B:13 O:0 / B:36 0.040484 0.566783 Del
152 274 2026-09-03 M:9 / W:36 726 Shift A P2.CU.2 14.60 x 1230.00 x 2440.00 MA B4 G1 40 P:2 / B:38 O:0 / B:0 0.040816 1.632653 Del
151 277 2026-09-03 M:9 / W:36 726/41 Shift A P2.CU.1 14.60 x 1230.00 x 2440.00 MA B4 G1 25 P:2 / B:23 O:0 / B:0 0.040816 1.020408 Del
150 280 2026-09-03 M:9 / W:36 327 Shift A P2.CU.2 17.60 x 1230.00 x 2440.00 MA B4 G1 17 P:0 / B:17 O:0 / B:0 0.049820 0.846939 Del
149 94 2026-09-03 M:9 / W:36 409//329 Shift A P2.CU.2 17.60 x 1230.00 x 2440.00 MA B4 G1 35 P:7 / B:28 O:0 / B:0 0.049820 1.743697 Del
148 342 2026-09-03 M:9 / W:36 376 Shift A P2.CU.2 20.50 x 1220.00 x 2440.00 MA B4 G1 30 P:3 / B:27 O:0 / B:0 0.058048 1.741428 Del
147 101 2026-09-03 M:9 / W:36 405 Shift A P2.CU.1 14.60 x 1230.00 x 2440.00 MA B4 G1 44 P:3 / B:41 O:0 / B:0 0.040816 1.795918 Del
146 52 2026-09-03 M:9 / W:36 298 Shift A P2.CU.1 14.60 x 1230.00 x 2440.00 MA B4 G1 50 P:0 / B:50 O:0 / B:0 0.040816 2.040816 Del