Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
641 897 15.00 1220.00 2440.00 FA B4 BB CC 0 / 50
640 896 15.00 1220.00 2440.00 FA B4 BB CC 0 / 50
639 815//785 2.40 915.00 1830.00 FM E1 UTY E 0 / 237
638 782//779 2.40 915.00 1830.00 FM E1 UTY E 0 / 286
637 778//782 2.40 915.00 1830.00 FM E1 UTY E 0 / 232
636 768//778 2.40 915.00 1830.00 FM E1 UTY E 0 / 264
635 751 2.40 915.00 1830.00 FM E1 UTY E 0 / 222
634 904//757 2.40 915.00 1830.00 FM E1 UTY E 0 / 260
633 904 2.40 915.00 1830.00 FM E1 UTY E 0 / 240
632 583 11.20 1220.00 2440.00 FM E1 BB CC 0 / 40

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
322 307 2026-09-07 M:September / W:37 221//456 Shift A P1.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 33 P:0 / B:33 O:0 / B:33 0.050606 1.669985 Del
321 306 2026-09-07 M:September / W:37 x Shift A P1.CU.3 2.70 x 915.00 x 1830.00 FM E1 UTY E 85 P:0 / B:85 O:0 / B:85 0.003684 0.313122 Del
320 305 2026-09-07 M:September / W:37 582 Shift B P1.CU.1 2.70 x 1220.00 x 2440.00 FA E2 CI D2 202 P:0 / B:202 O:0 / B:202 0.006549 1.322890 Del
319 304 2026-09-07 M:September / W:37 508 Shift B P1.CU.1 2.70 x 1220.00 x 2440.00 FA E2 CI D2 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
318 303 2026-09-07 M:September / W:37 592 Shift B P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 35 P:13 / B:22 O:0 / B:22 0.041675 1.458632 Del
317 302 2026-09-08 M:September / W:37 545 Shift A P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 38 P:0 / B:38 O:0 / B:38 0.041675 1.583658 Del
316 301 2026-09-07 M:September / W:37 447 Shift B P1.CU.3 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
315 300 2026-09-08 M:September / W:37 516 Shift A P1.CU.2 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
314 299 2026-09-07 M:September / W:37 515 Shift B P1.CU.2 11.60 x 915.00 x 1830.00 FA B4 G2 62 P:0 / B:62 O:0 / B:62 0.017749 1.100449 Del
313 298 2026-09-07 M:September / W:37 393 Shift B P1.CU.2 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del