Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
617 905 15.00 1220.00 2440.00 FA B4 CI 17 45 / 45
616 947 15.00 1220.00 2440.00 FA B4 CI 17 27 / 27
615 859 3.00 1220.00 2440.00 FA B4 BB CC 201 / 201
614 x 17.20 1220.00 2440.00 FM E1 7 / 7
613 923//x 11.60 1220.00 2440.00 MA B4 G1 22 / 22
612 665 11.60 1220.00 2440.00 MA B4 G1 37 / 37
611 910 15.00 1220.00 2440.00 FA B4 CI 17 50 / 50
610 924 11.60 1220.00 2440.00 MA B4 G1 60 / 60
609 923 11.60 1220.00 2440.00 MA B4 G1 53 / 53
608 944 11.60 1220.00 2440.00 MA B4 G1 60 / 60
Total: 536 data
< Prev Halaman 1 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
87 329 2026-09-01 M:9 / W:36 125 Shift A P2.CU.3 2.40 x 915.00 x 1830.00 FJB E1 UTY E 111 P:9 / B:102 O:57 / B:88 0.003181 0.353142 Del
86 42 2026-09-01 M:9 / W:36 115 Shift A P2.CU.4 2.40 x 915.00 x 1830.00 FJB E1 UTY E 90 P:0 / B:90 O:90 / B:0 0.003181 0.286331 Del
85 45 2026-09-01 M:9 / W:36 107 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FM E1 UTY E 194 P:3 / B:191 O:191 / B:0 0.003181 0.617202 Del
84 44 2026-09-01 M:9 / W:36 129 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FM E1 UTY E 182 P:1 / B:181 O:181 / B:0 0.003181 0.579025 Del
83 43 2026-09-01 M:9 / W:36 339 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 196 P:2 / B:194 O:194 / B:0 0.003181 0.623565 Del
81 39 2026-09-01 M:9 / W:36 257 Shift A P2.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 31 P:0 / B:31 O:15 / B:0 0.041675 1.291931 Del
80 38 2026-09-01 M:9 / W:36 259 Shift A P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 48 P:0 / B:48 O:48 / B:0 0.041675 2.000410 Del
79 29 2026-09-01 M:9 / W:36 300 Shift A P2.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 50 P:0 / B:50 O:50 / B:0 0.041675 2.083760 Del
78 71 2026-09-02 M:9 / W:36 254 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 24 P:8 / B:16 O:16 / B:176 0.009604 0.230492 Del
75 165 2026-09-08 M:9 / W:37 503 Shift A P2.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 100 P:0 / B:100 O:100 / B:0 0.011907 1.190720 Del