Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 670 | 873 | 14.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 38 | |
| 669 | 864 | 14.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 42 | |
| 668 | 935 | 14.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 50 | |
| 667 | 906//878 | 14.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 50 | |
| 666 | 917//916 | 8.60 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 80 | |
| 665 | x | 18.00 | 1220.00 | 2440.00 | FM E1 UTY E | 0 / 20 | |
| 664 | 906 | 14.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 50 | |
| 663 | 890//x | 8.60 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 80 | |
| 662 | 421//894 | 8.60 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 80 | |
| 661 | 421 | 8.60 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 50 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 288 | 273 | 2026-09-07 | M:September / W:37 | 534 | Shift B | P1.CU.2 | 15.00 x 1220.00 x 2440.00 | FA B4 CI 17 | 31 | P:0 / B:31 | O:0 / B:31 | 0.041675 | 1.291931 | Del |
| 287 | 272 | 2026-09-07 | M:September / W:37 | 535//534 | Shift B | P1.CU.3 | 15.00 x 1220.00 x 2440.00 | FA B4 CI 17 | 40 | P:0 / B:40 | O:0 / B:40 | 0.041675 | 1.667008 | Del |
| 286 | 271 | 2026-09-07 | M:September / W:37 | x | Shift B | P1.CU.1 | 15.00 x 1220.00 x 2440.00 | FA B4 BB CC LU DRI P | 11 | P:0 / B:11 | O:0 / B:11 | 0.041675 | 0.458427 | Del |
| 285 | 270 | 2026-09-07 | M:September / W:37 | x | Shift A | P1.CU.1 | 8.60 x 1230.00 x 2440.00 | MA B4 LU DRI PTS P1+ | 20 | P:1 / B:19 | O:0 / B:19 | 0.022809 | 0.456182 | Del |
| 284 | 269 | 2026-09-07 | M:September / W:37 | x | Shift B | P1.CU.1 | 18.00 x 1220.00 x 2440.00 | FA B4 BB CC LU DRI P | 7 | P:0 / B:7 | O:7 / B:0 | 0.050606 | 0.354239 | Del |
| 283 | 268 | 2026-09-07 | M:September / W:37 | 484 | Shift B | P1.CU.2 | 9.00 x 1220.00 x 2440.00 | FA E2 LKL UTY KRUING | 80 | P:0 / B:80 | O:0 / B:80 | 0.025005 | 2.000410 | Del |
| 282 | 267 | 2026-09-07 | M:September / W:37 | 325 | Shift A | P1.CU.1 | 9.00 x 1220.00 x 2440.00 | FA E2 BB CC | 80 | P:0 / B:80 | O:0 / B:80 | 0.023814 | 1.905152 | Del |
| 281 | 266 | 2026-09-07 | M:September / W:37 | 542 | Shift A | P1.CU.2 | 5.00 x 1220.00 x 2440.00 | FA E2 CI D2 | 100 | P:9 / B:91 | O:0 / B:91 | 0.011907 | 1.190720 | Del |
| 280 | 265 | 2026-09-05 | M:September / W:36 | 502 | Shift A | P1.CU.1 | 5.00 x 1220.00 x 2440.00 | FA E2 CI D2 | 100 | P:4 / B:96 | O:0 / B:96 | 0.011907 | 1.190720 | Del |
| 279 | 264 | 2026-09-07 | M:September / W:37 | 503 | Shift A | P1.CU.1 | 5.00 x 1220.00 x 2440.00 | FA E2 CI D2 | 100 | P:0 / B:100 | O:0 / B:100 | 0.011907 | 1.190720 | Del |