Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
56 316 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
55 315 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
54 314 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
53 110 2.40 915.00 1830.00 FJB E1 UTY E 0 / 199
52 236 2.40 915.00 1830.00 FJB E1 UTY E 0 / 198
51 303 2.70 1220.00 2440.00 FA E2 D1 D2 139 / 139
50 10 6.00 1220.00 2440.00 FA E2 BB CC 0 / 93
49 170//199 11.60 1230.00 2440.00 MA B4 G1 60 / 60
48 170 11.60 1230.00 2440.00 MA B4 G1 60 / 60
47 205 8.60 1230.00 2440.00 MA B4 G1 55 / 55

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
312 297 2026-09-08 M:September / W:37 520 Shift A P1.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 31 P:0 / B:31 O:0 / B:31 0.022773 0.705948 Del
311 296 2026-09-07 M:September / W:37 465 Shift B P1.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 47 P:0 / B:47 O:0 / B:47 0.022773 1.070308 Del
310 295 2026-09-07 M:September / W:37 560 Shift B P1.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 42 P:0 / B:42 O:0 / B:42 0.022773 0.956446 Del
309 294 2026-09-07 M:September / W:37 559 Shift B P1.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 41 P:0 / B:41 O:0 / B:41 0.022773 0.933673 Del
308 293 2026-09-08 M:September / W:37 29//593 Shift A P1.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 18 P:1 / B:17 O:0 / B:17 0.050606 0.910901 Del
307 292 2026-09-08 M:September / W:37 456//435 Shift A P1.CU.2 18.00 x 1220.00 x 2440.00 FM E1 UTY E 27 P:0 / B:27 O:0 / B:27 0.050606 1.366351 Del
306 291 2026-09-07 M:September / W:37 456 Shift B P1.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 23 P:0 / B:23 O:0 / B:23 0.050606 1.163929 Del
305 290 2026-09-07 M:September / W:37 145 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 120 P:0 / B:120 O:0 / B:120 0.003181 0.381775 Del
304 289 2026-09-07 M:September / W:37 128 Shift A P1.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:4 / B:196 O:0 / B:196 0.003181 0.636291 Del
303 288 2026-09-07 M:September / W:37 127 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 201 P:0 / B:201 O:0 / B:201 0.003181 0.639472 Del