Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
532 796//801 8.60 915.00 1830.00 MA B4 G1 80 / 80
531 x//917 8.60 1220.00 2440.00 MA B4 G1 0 / 68
530 x 15.00 1220.00 2440.00 FA B4 CI 17 0 / 12
528 849//848 14.60 915.00 1830.00 MA B4 G1 60 / 60
527 631 17.60 1220.00 2440.00 FA B4 CI 17 -25 / 39
526 650 18.00 1220.00 2440.00 FA B4 CI 17 0 / 25
525 650 18.00 920.00 2440.00 FA B4 CI 17 26 / 26
524 849 14.60 915.00 1830.00 MA B4 G1 40 / 40
523 64 18.00 1220.00 2440.00 FA B4 11 / 29
522 740 15.00 1220.00 0.00 FA B4 CI 17 32 / 32
Total: 521 data
< Prev Halaman 4 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
97 70 2026-09-02 M:9 / W:36 385 Shift A P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 27 P:5 / B:22 O:22 / B:151 0.009604 0.259304 Del
96 332 2026-09-01 M:9 / W:36 319//323 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 MA B4 G1 43 P:4 / B:39 O:39 / B:0 0.031813 1.367947 Del
94 331 2026-09-01 M:9 / W:36 124 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 38 P:0 / B:38 O:38 / B:153 0.003181 0.120895 Del
93 330 2026-09-01 M:9 / W:36 135 Shift B P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:3 / B:197 O:106 / B:0 0.003181 0.636291 Del
92 34 2026-09-01 M:9 / W:36 170//199 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 MA B4 G1 59 P:4 / B:55 O:55 / B:0 0.031813 1.876950 Del
90 40 2026-09-01 M:9 / W:36 257/382 Shift A P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 47 P:1 / B:46 O:46 / B:0 0.041675 1.958734 Del
89 35 2026-09-01 M:9 / W:36 320 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 MA B4 G1 33 P:0 / B:33 O:10 / B:0 0.031813 1.049820 Del
88 32 2026-09-01 M:9 / W:36 170 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 MA B4 G1 25 P:1 / B:24 O:24 / B:35 0.031813 0.795318 Del
87 329 2026-09-01 M:9 / W:36 125 Shift A P2.CU.3 2.40 x 915.00 x 1830.00 FJB E1 UTY E 111 P:9 / B:102 O:57 / B:88 0.003181 0.353142 Del
86 42 2026-09-01 M:9 / W:36 115 Shift A P2.CU.4 2.40 x 915.00 x 1830.00 FJB E1 UTY E 90 P:0 / B:90 O:90 / B:0 0.003181 0.286331 Del