Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 134 | 423 | 11.60 | 915.00 | 1830.00 | FA B4 G2 | 0 / 59 | |
| 133 | 391 | 11.60 | 915.00 | 1830.00 | FA B4 G2 | 0 / 62 | |
| 132 | 818 | 20.50 | 915.00 | 1830.00 | MA B4 G1 | 0 / 20 | |
| 131 | 804 | 20.50 | 915.00 | 1830.00 | MA B4 G1 | 0 / 30 | |
| 130 | 359 | 11.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 60 | |
| 129 | 381 | 11.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 60 | |
| 128 | 408 | 11.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 60 | |
| 127 | 407 | 11.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 60 | |
| 126 | 386 | 11.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 60 | |
| 125 | 387 | 11.60 | 915.00 | 1830.00 | MA B4 G1 | 0 / 60 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 278 | 263 | 2026-09-07 | M:September / W:37 | x | Shift B | P1.CU.1 | 20.50 x 1230.00 x 2440.00 | MA B4 LU DRI PTS P1+ | 2 | P:0 / B:2 | O:0 / B:2 | 0.058523 | 0.117047 | Del |
| 277 | 262 | 2026-09-07 | M:September / W:37 | x | Shift A | P1.CU.2 | 15.00 x 1220.00 x 2440.00 | FA B4 BB CC LU DRI P | 6 | P:0 / B:6 | O:0 / B:6 | 0.041675 | 0.250051 | Del |
| 276 | 261 | 2026-09-07 | M:September / W:37 | x | Shift A | P1.CU.2 | 8.60 x 1230.00 x 2440.00 | MA B4 LU DRI PTS P1+ | 16 | P:0 / B:16 | O:0 / B:16 | 0.022809 | 0.364946 | Del |
| 275 | 260 | 2026-09-07 | M:September / W:37 | x | Shift A | P1.CU.2 | 15.00 x 1220.00 x 2440.00 | FA B4 BB CC LU DRI P | 21 | P:0 / B:21 | O:0 / B:21 | 0.041675 | 0.875179 | Del |
| 274 | 259 | 2026-09-07 | M:September / W:37 | x | Shift B | P1.CU.6 | 17.60 x 1220.00 x 2440.00 | FA B4 BB CC LU DRI P | 23 | P:0 / B:23 | O:0 / B:23 | 0.049415 | 1.136542 | Del |
| 273 | 258 | 2026-09-07 | M:September / W:37 | x | Shift A | P1.CU.1 | 20.50 x 1230.00 x 2440.00 | MA B4 LU DRI PTS P1+ | 2 | P:0 / B:2 | O:0 / B:2 | 0.058523 | 0.117047 | Del |
| 272 | 257 | 2026-09-07 | M:September / W:37 | x | Shift A | P1.CU.1 | 14.60 x 1230.00 x 2440.00 | MA B4 LU DRI PTS P1+ | 5 | P:1 / B:4 | O:0 / B:4 | 0.040816 | 0.204082 | Del |
| 271 | 256 | 2026-09-05 | M:September / W:36 | 864 | Shift A | P1.CU.1 | 9.00 x 1220.00 x 2440.00 | FM E2 LKL C11 7 | 59 | P:14 / B:45 | O:0 / B:45 | 0.023814 | 1.405050 | Del |
| 270 | 255 | 2026-09-07 | M:September / W:37 | 302 | Shift A | P1.CU.2 | 9.00 x 1220.00 x 2440.00 | FA E2 LKL UTY KRUING | 54 | P:1 / B:53 | O:0 / B:53 | 0.025005 | 1.350276 | Del |
| 269 | 254 | 2026-09-07 | M:September / W:37 | 302 | Shift B | P1.CU.3 | 9.00 x 1220.00 x 2440.00 | FA E2 LKL UTY KRUING | 30 | P:1 / B:29 | O:0 / B:29 | 0.025005 | 0.750154 | Del |