Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
572 x 15.00 1220.00 2440.00 FA B4 BB CC LU DRI P 0 / 6
571 897 15.00 1220.00 2440.00 FA B4 CI 17 0 / 50
570 891 8.60 1220.00 2440.00 MA B4 G1 79 / 79
569 894//890 8.60 1220.00 2440.00 MA B4 G1 0 / 80
567 822 8.60 1220.00 2440.00 MA B4 G1 0 / 76
565 890//x 8.60 1220.00 2440.00 MA B4 G1 0 / 80
563 858 3.00 1220.00 2440.00 FA B4 BB CC 0 / 200
560 821 8.60 1220.00 2440.00 MA B4 G1 0 / 65
559 815//785 2.40 915.00 1830.00 FM E1 UTY E 0 / 231
558 728 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
Total: 521 data
< Prev Halaman 1 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
124 82 2026-09-02 M:9 / W:36 50 Shift B P2.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:0 0.017749 1.064950 Del
123 79 2026-09-02 M:9 / W:36 381 Shift B P2.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 59 P:0 / B:59 O:0 / B:0 0.017749 1.047201 Del
122 66 2026-09-02 M:9 / W:36 356 Shift B P2.CU.1 11.60 x 920.00 x 1830.00 MA B4 G1 59 P:1 / B:58 O:0 / B:0 0.017846 1.052923 Del
121 59 2026-09-02 M:9 / W:36 297+368 Shift B P2.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 45 P:1 / B:44 O:0 / B:0 0.022897 1.030363 Del
120 90 2026-09-02 M:9 / W:36 x Shift A P2.CU.1 3.70 x 1230.00 x 2440.00 FM B4 G1,5 197 P:15 / B:182 O:0 / B:0 0.009604 1.891956 Del
119 73 2026-09-02 M:9 / W:36 342 Shift A P2.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 50 P:0 / B:50 O:0 / B:0 0.031813 1.590636 Del
118 72 2026-09-02 M:9 / W:36 343 Shift B P2.CU.3 11.60 x 1230.00 x 2440.00 FA B4 G2 59 P:0 / B:59 O:0 / B:0 0.031813 1.876950 Del
117 74 2026-09-02 M:9 / W:36 341 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 15 P:0 / B:15 O:0 / B:43 0.031813 0.477191 Del
116 81 2026-09-02 M:9 / W:36 407 Shift A P2.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 57 P:1 / B:56 O:0 / B:0 0.017749 1.011703 Del
115 80 2026-09-02 M:9 / W:36 387 Shift A P2.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:0 0.017749 1.064950 Del