Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
559 870 11.60 915.00 1830.00 FA B4 G2 0 / 38
558 861//705 11.60 915.00 1830.00 FA B4 G2 0 / 60
557 842 11.60 915.00 1830.00 FA B4 G2 0 / 62
556 818 11.60 915.00 1830.00 FA B4 G2 0 / 60
555 860 11.60 915.00 1830.00 FA B4 G2 0 / 59
554 705 11.60 915.00 1830.00 FA B4 G2 0 / 43
553 844 11.60 915.00 1830.00 FA B4 G2 0 / 60
552 832 11.60 915.00 1830.00 FA B4 G2 0 / 60
551 833 11.60 915.00 1830.00 FA B4 G2 0 / 60
550 719 11.60 915.00 1830.00 FA B4 G2 60 / 60

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
292 277 2026-09-08 M:September / W:37 506 Shift A P1.CU.1 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017556 1.053343 Del
291 276 2026-09-07 M:September / W:37 518 Shift B P1.CU.1 5.00 x 1220.00 x 2440.00 FA E2 CI D2 102 P:3 / B:99 O:0 / B:99 0.011907 1.214534 Del
290 275 2026-09-07 M:September / W:37 510 Shift A P1.CU.1 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017556 1.053343 Del
289 274 2026-09-08 M:September / W:37 458 Shift A P1.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017556 1.053343 Del
288 273 2026-09-07 M:September / W:37 534 Shift B P1.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 31 P:0 / B:31 O:0 / B:31 0.041675 1.291931 Del
287 272 2026-09-07 M:September / W:37 535//534 Shift B P1.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 40 P:0 / B:40 O:0 / B:40 0.041675 1.667008 Del
286 271 2026-09-07 M:September / W:37 x Shift B P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 BB CC LU DRI P 11 P:0 / B:11 O:0 / B:11 0.041675 0.458427 Del
285 270 2026-09-07 M:September / W:37 x Shift A P1.CU.1 8.60 x 1230.00 x 2440.00 MA B4 LU DRI PTS P1+ 20 P:1 / B:19 O:0 / B:19 0.022809 0.456182 Del
284 269 2026-09-07 M:September / W:37 x Shift B P1.CU.1 18.00 x 1220.00 x 2440.00 FA B4 BB CC LU DRI P 7 P:0 / B:7 O:7 / B:0 0.050606 0.354239 Del
283 268 2026-09-07 M:September / W:37 484 Shift B P1.CU.2 9.00 x 1220.00 x 2440.00 FA E2 LKL UTY KRUING 80 P:0 / B:80 O:0 / B:80 0.025005 2.000410 Del