Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
607 843 11.60 915.00 1830.00 FA B4 G2 0 / 65
606 719//718 11.60 915.00 1830.00 FA B4 G2 0 / 61
605 604 11.60 915.00 1830.00 FA B4 G2 0 / 60
604 723 11.60 915.00 1830.00 FA B4 G2 0 / 35
603 468 18.00 1220.00 2440.00 FA E1 UTY 0 / 23
602 243 5.00 915.00 1830.00 FM E2 CI 17 0 / 53
601 662 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 46
600 710 5.00 920.00 2440.00 FM E1 UTY E 0 / 100
599 642 11.00 1220.00 2440.00 FM PENOL MAHONI 0 / 2
598 693//692 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 100

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
258 243 2026-09-04 M:September / W:36 x Shift A P1.CU.1 3.70 x 1220.00 x 2440.00 FM B4 G1 183 P:0 / B:183 O:0 / B:183 0.009526 1.743214 Del
257 242 2026-09-04 M:September / W:36 133 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:0 / B:200 O:0 / B:200 0.003181 0.636291 Del
256 241 2026-09-04 M:September / W:36 499 Shift B P1.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 34 P:0 / B:34 O:0 / B:34 0.017556 0.596894 Del
255 240 2026-09-04 M:September / W:36 505//499 Shift B P1.CU.1 11.60 x 910.00 x 1820.00 FA B4 G2 41 P:0 / B:41 O:0 / B:41 0.017556 0.719785 Del
254 239 2026-09-04 M:September / W:36 505 Shift B P1.CU.1 11.60 x 910.00 x 1820.00 FA B4 G2 40 P:2 / B:38 O:0 / B:38 0.017556 0.702229 Del
253 238 2026-09-04 M:September / W:36 501 Shift B P1.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:1 / B:59 O:0 / B:59 0.017556 1.053343 Del
252 237 2026-09-04 M:September / W:36 422 Shift B P1.CU.1 11.60 x 920.00 x 1830.00 MA B4 G1 29 P:0 / B:29 O:0 / B:29 0.017846 0.517539 Del
251 236 2026-09-04 M:September / W:36 x Shift B P1.CU.1 11.60 x 920.00 x 1830.00 MA B4 G1 39 P:0 / B:39 O:0 / B:39 0.017846 0.696000 Del
250 235 2026-09-04 M:September / W:36 x Shift B P1.CU.2 11.60 x 920.00 x 1830.00 MA B4 G1 51 P:0 / B:51 O:0 / B:51 0.017846 0.910154 Del
249 234 2026-09-04 M:September / W:36 425 Shift B P1.CU.2 11.60 x 920.00 x 1830.00 MA B4 G1 59 P:0 / B:59 O:0 / B:59 0.017846 1.052923 Del