Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 176 | 961 | 9.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 70 | |
| 175 | 968 | 9.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 80 | |
| 174 | 430 | 11.60 | 1220.00 | 2440.00 | FA B4 G2 | 0 / 53 | |
| 173 | 41 | 14.60 | 1230.00 | 2440.00 | MA B4 G1 | 20 / 20 | |
| 172 | 41 | 14.60 | 1230.00 | 2440.00 | MA B4 G1 | 30 / 30 | |
| 171 | 405 | 14.60 | 1230.00 | 2440.00 | MA B4 G1 | 0 / 50 | |
| 170 | 455 | 11.60 | 910.00 | 1820.00 | FA B4 G2 | 0 / 23 | |
| 169 | 426 | 11.60 | 910.00 | 1820.00 | FA B4 G2 | 0 / 60 | |
| 168 | 429 | 11.60 | 910.00 | 1820.00 | FA B4 G2 | 0 / 41 | |
| 167 | 416 | 11.60 | 910.00 | 1820.00 | FA B4 G2 | 0 / 60 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 282 | 267 | 2026-09-07 | M:September / W:37 | 325 | Shift A | P1.CU.1 | 9.00 x 1220.00 x 2440.00 | FA E2 BB CC | 80 | P:0 / B:80 | O:0 / B:80 | 0.023814 | 1.905152 | Del |
| 281 | 266 | 2026-09-07 | M:September / W:37 | 542 | Shift A | P1.CU.2 | 5.00 x 1220.00 x 2440.00 | FA E2 CI D2 | 100 | P:9 / B:91 | O:0 / B:91 | 0.011907 | 1.190720 | Del |
| 280 | 265 | 2026-09-05 | M:September / W:36 | 502 | Shift A | P1.CU.1 | 5.00 x 1220.00 x 2440.00 | FA E2 CI D2 | 100 | P:4 / B:96 | O:0 / B:96 | 0.011907 | 1.190720 | Del |
| 279 | 264 | 2026-09-07 | M:September / W:37 | 503 | Shift A | P1.CU.1 | 5.00 x 1220.00 x 2440.00 | FA E2 CI D2 | 100 | P:0 / B:100 | O:0 / B:100 | 0.011907 | 1.190720 | Del |
| 278 | 263 | 2026-09-07 | M:September / W:37 | x | Shift B | P1.CU.1 | 20.50 x 1230.00 x 2440.00 | MA B4 LU DRI PTS P1+ | 2 | P:0 / B:2 | O:0 / B:2 | 0.058523 | 0.117047 | Del |
| 277 | 262 | 2026-09-07 | M:September / W:37 | x | Shift A | P1.CU.2 | 15.00 x 1220.00 x 2440.00 | FA B4 BB CC LU DRI P | 6 | P:0 / B:6 | O:0 / B:6 | 0.041675 | 0.250051 | Del |
| 276 | 261 | 2026-09-07 | M:September / W:37 | x | Shift A | P1.CU.2 | 8.60 x 1230.00 x 2440.00 | MA B4 LU DRI PTS P1+ | 16 | P:0 / B:16 | O:0 / B:16 | 0.022809 | 0.364946 | Del |
| 275 | 260 | 2026-09-07 | M:September / W:37 | x | Shift A | P1.CU.2 | 15.00 x 1220.00 x 2440.00 | FA B4 BB CC LU DRI P | 21 | P:0 / B:21 | O:0 / B:21 | 0.041675 | 0.875179 | Del |
| 274 | 259 | 2026-09-07 | M:September / W:37 | x | Shift B | P1.CU.6 | 17.60 x 1220.00 x 2440.00 | FA B4 BB CC LU DRI P | 23 | P:0 / B:23 | O:0 / B:23 | 0.049415 | 1.136542 | Del |
| 273 | 258 | 2026-09-07 | M:September / W:37 | x | Shift A | P1.CU.1 | 20.50 x 1230.00 x 2440.00 | MA B4 LU DRI PTS P1+ | 2 | P:0 / B:2 | O:0 / B:2 | 0.058523 | 0.117047 | Del |