Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
589 95 5.00 915.00 1830.00 FA E2 UTY KRUING 0 / 101
588 94 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 101
587 63 5.00 1220.00 2440.00 FM E2 LKL C11 7 0 / 96
586 55 5.00 910.00 1830.00 FM E2 LKL C11 7 0 / 96
585 32 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 64
584 31 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 101
583 30 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 100
582 939 8.20 1220.00 2440.00 FM E1 BB CC 0 / 70
581 446//445 11.60 915.00 1830.00 FA B4 G2 0 / 56
580 417//377 20.50 1220.00 2440.00 MA B4 G1 0 / 35

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
252 237 2026-09-04 M:September / W:36 422 Shift B P1.CU.1 11.60 x 920.00 x 1830.00 MA B4 G1 29 P:0 / B:29 O:0 / B:29 0.017846 0.517539 Del
251 236 2026-09-04 M:September / W:36 x Shift B P1.CU.1 11.60 x 920.00 x 1830.00 MA B4 G1 39 P:0 / B:39 O:0 / B:39 0.017846 0.696000 Del
250 235 2026-09-04 M:September / W:36 x Shift B P1.CU.2 11.60 x 920.00 x 1830.00 MA B4 G1 51 P:0 / B:51 O:0 / B:51 0.017846 0.910154 Del
249 234 2026-09-04 M:September / W:36 425 Shift B P1.CU.2 11.60 x 920.00 x 1830.00 MA B4 G1 59 P:0 / B:59 O:0 / B:59 0.017846 1.052923 Del
248 233 2026-09-05 M:September / W:36 x Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 MA B4 G1 40 P:1 / B:39 O:0 / B:39 0.031813 1.272509 Del
247 232 2026-09-05 M:September / W:36 420//x Shift A P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 28 P:0 / B:28 O:0 / B:28 0.041675 1.166906 Del
246 231 2026-09-05 M:September / W:36 420 Shift A P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 31 P:3 / B:28 O:0 / B:28 0.041675 1.291931 Del
245 230 2026-09-04 M:September / W:36 471 Shift B P1.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 48 P:5 / B:43 O:0 / B:43 0.041675 2.000410 Del
244 229 2026-09-04 M:September / W:36 382//472// Shift B P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 42 P:1 / B:41 O:41 / B:0 0.041675 1.750358 Del
243 228 2026-09-04 M:September / W:36 476//478 Shift B P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 35 P:0 / B:35 O:0 / B:35 0.041675 1.458632 Del