Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
424 702//701 20.00 1220.00 2440.00 MA B4 G1 0 / 31
423 411 2.70 920.00 2440.00 FA E1 UTY 190 / 190
422 602 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
421 682//697 20.50 1220.00 2440.00 MA B4 G1 22 / 22
420 536 20.50 1220.00 2440.00 MA B4 G1 0 / 19
419 536 20.50 1220.00 2440.00 MA B4 G1 21 / 21
418 701//347 20.50 1220.00 2440.00 MA B4 G1 0 / 21
417 713 6.00 1220.00 2440.00 FA B4 BB CC 59 / 59
416 637 18.00 1220.00 2440.00 FA B4 BB CC 36 / 36
415 612 11.60 915.00 1830.00 FA B4 G2 50 / 50
Total: 521 data
< Prev Halaman 14 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
61 322 2026-09-07 M:9 / W:37 454 Shift B P2.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:4 / B:56 O:56 / B:0 0.031813 1.908763 Del
60 273 2026-09-07 M:9 / W:37 476 Shift A P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 16 P:0 / B:16 O:16 / B:15 0.041675 0.666803 Del
59 154 2026-09-07 M:9 / W:37 478//471 Shift A P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 50 P:0 / B:50 O:50 / B:0 0.041675 2.083760 Del
57 321 2026-09-07 M:9 / W:37 510 Shift A P2.CU.1 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:60 / B:0 0.017556 1.053343 Del
54 285 2026-09-07 M:9 / W:37 430 Shift A P2.CU.1 11.60 x 1220.00 x 2440.00 FA B4 G2 51 P:3 / B:48 O:48 / B:0 0.031554 1.609258 Del
53 320 2026-09-07 M:9 / W:37 354 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 40 P:4 / B:36 O:37 / B:0 0.031813 1.272509 Del
51 287 2026-09-07 M:9 / W:37 67 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 79 P:3 / B:76 O:76 / B:0 0.031813 2.513205 Del
50 319 2026-09-07 M:9 / W:37 426 Shift A P2.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 59 P:2 / B:57 O:57 / B:0 0.017556 1.035787 Del
49 292 2026-09-07 M:9 / W:37 453/x Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:1 / B:59 O:59 / B:0 0.031813 1.908763 Del
48 290 2026-09-07 M:9 / W:37 457 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 53 P:5 / B:48 O:48 / B:0 0.031813 1.686074 Del