Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
477 756 5.00 915.00 1830.00 FM E2 UTY B(1xP) 35 / 84
476 680 11.60 915.00 1830.00 FA B4 G2 64 / 64
475 805 2.40 915.00 1830.00 FM E1 UTY E 200 / 200
474 x 18.00 1220.00 2440.00 FA E1 UTY 32 / 32
473 679 11.60 915.00 1830.00 FA B4 G2 41 / 41
472 752 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
471 790 2.40 915.00 1830.00 FM E1 UTY E 200 / 200
470 870 11.60 915.00 1830.00 FA B4 G2 36 / 36
468 833 11.60 915.00 1830.00 FA B4 G2 60 / 60
467 745 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
Total: 521 data
< Prev Halaman 9 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
73 170 2026-09-08 M:9 / W:37 450//440 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 121 P:3 / B:118 O:118 / B:57 0.003181 0.384956 Del
72 51 2026-09-08 M:9 / W:37 420//x Shift B P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 28 P:0 / B:28 O:28 / B:0 0.041675 1.166906 Del
70 327 2026-09-08 M:9 / W:37 435 Shift B P2.CU.2 18.00 x 1220.00 x 2440.00 FM E2 CI 17 29 P:0 / B:29 O:0 / B:0 0.050606 1.467562 Del
69 325 2026-09-08 M:9 / W:37 46 Shift B P2.CU.2 8.20 x 1220.00 x 2440.00 FM E1 BB CC 6 P:5 / B:1 O:60 / B:59 0.021433 0.128598 Del
67 323 2026-09-08 M:9 / W:37 939 Shift B P2.CU.3 8.20 x 1220.00 x 2440.00 FM E1 BB CC 23 P:5 / B:18 O:18 / B:47 0.021433 0.492958 Del
63 166 2026-09-08 M:9 / W:37 542 Shift A P2.CU.1 5.00 x 1220.00 x 2440.00 FA E2 CI D2 90 P:0 / B:90 O:90 / B:0 0.011907 1.071648 Del
62 140 2026-09-07 M:9 / W:37 x Shift A P2.CU.2 3.70 x 1220.00 x 2440.00 FM B4 G1 67 P:16 / B:51 O:51 / B:116 0.009526 0.638226 Del
61 322 2026-09-07 M:9 / W:37 454 Shift B P2.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:4 / B:56 O:56 / B:0 0.031813 1.908763 Del
60 273 2026-09-07 M:9 / W:37 476 Shift A P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 16 P:0 / B:16 O:16 / B:15 0.041675 0.666803 Del
59 154 2026-09-07 M:9 / W:37 478//471 Shift A P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 50 P:0 / B:50 O:50 / B:0 0.041675 2.083760 Del