Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
710 x 8.20 1220.00 2440.00 FM E1 0 / 31
709 x 11.20 1220.00 2440.00 FM E1 0 / 13
708 X 8.60 1220.00 2440.00 FA B4 G1 0 / 16
707 X 20.50 1220.00 2440.00 MA B4 G1 0 / 7
706 X 20.50 915.00 1830.00 MA B4 G1 1 / 1
705 X 14.60 1220.00 2440.00 MA B4 G1 0 / 50
704 X 14.60 1220.00 2440.00 MA B4 G1 0 / 11
703 X 14.60 915.00 1830.00 MA B4 G1 0 / 33
702 X 11.60 915.00 1830.00 FA B4 G1 0 / 44
701 X 11.60 1220.00 2440.00 FA B4 G1 0 / 10

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
218 203 2026-09-03 M:September / W:36 464 Shift B P1.CU.8 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:1 / B:49 O:0 / B:49 0.022897 1.144848 Del
217 202 2026-09-03 M:September / W:36 475 Shift A P1.CU.6 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:1 / B:49 O:0 / B:49 0.022897 1.144848 Del
216 201 2026-09-03 M:September / W:36 404 Shift B P1.CU.9 14.60 x 920.00 x 1830.00 MA B4 G1 30 P:0 / B:30 O:0 / B:30 0.022897 0.686909 Del
215 200 2026-09-03 M:September / W:36 420 Shift B P1.CU.4 14.60 x 920.00 x 1830.00 MA B4 G1 40 P:0 / B:40 O:0 / B:40 0.022897 0.915878 Del
214 199 2026-09-04 M:September / W:36 483 Shift A P1.CU.1 18.00 x 1220.00 x 2440.00 FM E2 CI 17 15 P:0 / B:15 O:15 / B:0 0.050606 0.759084 Del
213 198 2026-09-09 M:September / W:37 491//483 Shift B P1.CU.2 18.00 x 1220.00 x 2440.00 FM E2 CI 17 35 P:0 / B:35 O:0 / B:35 0.050606 1.771196 Del
212 197 2026-09-04 M:September / W:36 491 Shift A P1.CU.2 18.00 x 1220.00 x 2440.00 FM E2 CI 17 25 P:0 / B:25 O:0 / B:25 0.050606 1.265140 Del
211 196 2026-09-03 M:September / W:36 418 Shift A P1.CU.10 2.70 x 915.00 x 1830.00 FJB E1 UTY E 200 P:0 / B:200 O:0 / B:200 0.003684 0.736758 Del
210 195 2026-09-03 M:September / W:36 428 Shift A P1.CU.10 2.70 x 915.00 x 1830.00 FJB E1 UTY E 164 P:0 / B:164 O:0 / B:164 0.003684 0.604142 Del
209 194 2026-09-03 M:September / W:36 481 Shift A P1.CU.9 2.70 x 915.00 x 1830.00 FJB E1 UTY E 200 P:0 / B:200 O:0 / B:200 0.003684 0.736758 Del