Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
437 716 2.70 1220.00 2440.00 FA E1 UTY 0 / 196
436 659 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
435 630 18.00 1220.00 2440.00 FA B4 BB CC 0 / 23
434 654 18.00 1220.00 2440.00 FA B4 BB CC 0 / 33
433 668 18.00 1220.00 2440.00 FA B4 BB CC 0 / 41
432 588 18.00 1220.00 2440.00 FA B4 BB CC 0 / 40
431 x 18.00 1220.00 2440.00 FA B4 BB CC 0 / 30
430 637 18.00 1220.00 2440.00 FA B4 BB CC 0 / 36
429 585 18.00 1220.00 2440.00 FA B4 BB CC 0 / 31
428 586 18.00 1220.00 2440.00 FA B4 BB CC 0 / 32

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
242 227 2026-09-04 M:September / W:36 476 Shift A P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 31 P:0 / B:31 O:0 / B:31 0.041675 1.291931 Del
241 226 2026-09-05 M:September / W:36 x Shift A P1.CU.1 9.00 x 1220.00 x 2440.00 FM E2 CI 17 60 P:3 / B:57 O:0 / B:57 0.023814 1.428864 Del
240 225 2026-09-05 M:September / W:36 x Shift A P1.CU.1 9.00 x 1220.00 x 2440.00 FM E2 CI 17 47 P:0 / B:47 O:0 / B:47 0.023814 1.119277 Del
239 224 2026-09-04 M:September / W:36 x Shift B P1.CU.2 3.00 x 1220.00 x 2440.00 FA B4 BB CC 186 P:16 / B:170 O:0 / B:170 0.007442 1.384212 Del
238 223 2026-09-04 M:September / W:36 x Shift B P1.CU.2 3.00 x 1220.00 x 2440.00 FA B4 BB CC 198 P:0 / B:198 O:0 / B:198 0.007442 1.473516 Del
237 222 2026-09-04 M:September / W:36 231 Shift A P1.CU.2 3.00 x 1220.00 x 2440.00 FA B4 BB CC 190 P:0 / B:190 O:0 / B:190 0.007442 1.413980 Del
236 221 2026-09-04 M:September / W:36 477 Shift B P1.CU.1 3.00 x 1220.00 x 2440.00 FA B4 BB CC 200 P:0 / B:200 O:0 / B:200 0.007442 1.488400 Del
235 220 2026-09-04 M:September / W:36 492 Shift A P1.CU.1 18.00 x 1220.00 x 2440.00 FM E2 CI 17 31 P:0 / B:31 O:0 / B:31 0.050606 1.568774 Del
234 219 2026-09-04 M:September / W:36 968 Shift B P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 59 P:5 / B:54 O:0 / B:54 0.031813 1.876950 Del
233 218 2026-09-04 M:September / W:36 967 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:1 / B:59 O:0 / B:59 0.031813 1.908763 Del