Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 274 | 458 | 11.60 | 910.00 | 1820.00 | FA B4 G2 | 0 / 60 | |
| 273 | 534 | 15.00 | 1220.00 | 2440.00 | FA B4 CI 17 | 0 / 31 | |
| 272 | 535//534 | 15.00 | 1220.00 | 2440.00 | FA B4 CI 17 | 0 / 40 | |
| 271 | x | 15.00 | 1220.00 | 2440.00 | FA B4 BB CC LU DRI P | 0 / 11 | |
| 270 | x | 8.60 | 1230.00 | 2440.00 | MA B4 LU DRI PTS P1+ | 0 / 20 | |
| 269 | x | 18.00 | 1220.00 | 2440.00 | FA B4 BB CC LU DRI P | 0 / 7 | |
| 268 | 484 | 9.00 | 1220.00 | 2440.00 | FA E2 LKL UTY KRUING | 0 / 80 | |
| 267 | 325 | 9.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 80 | |
| 266 | 542 | 5.00 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 100 | |
| 265 | 502 | 5.00 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 100 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 218 | 203 | 2026-09-03 | M:September / W:36 | 464 | Shift B | P1.CU.8 | 14.60 x 920.00 x 1830.00 | MA B4 G1 | 50 | P:1 / B:49 | O:0 / B:49 | 0.022897 | 1.144848 | Del |
| 217 | 202 | 2026-09-03 | M:September / W:36 | 475 | Shift A | P1.CU.6 | 14.60 x 920.00 x 1830.00 | MA B4 G1 | 50 | P:1 / B:49 | O:0 / B:49 | 0.022897 | 1.144848 | Del |
| 216 | 201 | 2026-09-03 | M:September / W:36 | 404 | Shift B | P1.CU.9 | 14.60 x 920.00 x 1830.00 | MA B4 G1 | 30 | P:0 / B:30 | O:0 / B:30 | 0.022897 | 0.686909 | Del |
| 215 | 200 | 2026-09-03 | M:September / W:36 | 420 | Shift B | P1.CU.4 | 14.60 x 920.00 x 1830.00 | MA B4 G1 | 40 | P:0 / B:40 | O:0 / B:40 | 0.022897 | 0.915878 | Del |
| 214 | 199 | 2026-09-04 | M:September / W:36 | 483 | Shift A | P1.CU.1 | 18.00 x 1220.00 x 2440.00 | FM E2 CI 17 | 15 | P:0 / B:15 | O:15 / B:0 | 0.050606 | 0.759084 | Del |
| 213 | 198 | 2026-09-09 | M:September / W:37 | 491//483 | Shift B | P1.CU.2 | 18.00 x 1220.00 x 2440.00 | FM E2 CI 17 | 35 | P:0 / B:35 | O:0 / B:35 | 0.050606 | 1.771196 | Del |
| 212 | 197 | 2026-09-04 | M:September / W:36 | 491 | Shift A | P1.CU.2 | 18.00 x 1220.00 x 2440.00 | FM E2 CI 17 | 25 | P:0 / B:25 | O:0 / B:25 | 0.050606 | 1.265140 | Del |
| 211 | 196 | 2026-09-03 | M:September / W:36 | 418 | Shift A | P1.CU.10 | 2.70 x 915.00 x 1830.00 | FJB E1 UTY E | 200 | P:0 / B:200 | O:0 / B:200 | 0.003684 | 0.736758 | Del |
| 210 | 195 | 2026-09-03 | M:September / W:36 | 428 | Shift A | P1.CU.10 | 2.70 x 915.00 x 1830.00 | FJB E1 UTY E | 164 | P:0 / B:164 | O:0 / B:164 | 0.003684 | 0.604142 | Del |
| 209 | 194 | 2026-09-03 | M:September / W:36 | 481 | Shift A | P1.CU.9 | 2.70 x 915.00 x 1830.00 | FJB E1 UTY E | 200 | P:0 / B:200 | O:0 / B:200 | 0.003684 | 0.736758 | Del |