Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
435 569 2.70 1220.00 2440.00 FA E1 UTY 196 / 196
434 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 6
433 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 198
432 x 2.70 1220.00 2440.00 FA E2 D1 D2 0 / 199
431 780 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
429 775 15.00 920.00 2440.00 FA B4 CI 17 0 / 50
428 707 18.00 1220.00 2440.00 FA E2 BB CC 0 / 40
427 708 18.00 1220.00 2440.00 FA E2 BB CC 0 / 34
426 513 2.70 1220.00 2440.00 FA E1 UTY 165 / 200
425 715//714 6.00 1220.00 2440.00 FA B4 BB CC 0 / 65
Total: 521 data
< Prev Halaman 13 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
53 320 2026-09-07 M:9 / W:37 354 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 40 P:4 / B:36 O:37 / B:0 0.031813 1.272509 Del
51 287 2026-09-07 M:9 / W:37 67 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 79 P:3 / B:76 O:76 / B:0 0.031813 2.513205 Del
50 319 2026-09-07 M:9 / W:37 426 Shift A P2.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 59 P:2 / B:57 O:57 / B:0 0.017556 1.035787 Del
49 292 2026-09-07 M:9 / W:37 453/x Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:1 / B:59 O:59 / B:0 0.031813 1.908763 Del
48 290 2026-09-07 M:9 / W:37 457 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 53 P:5 / B:48 O:48 / B:0 0.031813 1.686074 Del
47 286 2026-09-07 M:9 / W:37 455 Shift A P2.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 23 P:0 / B:23 O:23 / B:0 0.017556 0.403782 Del
46 318 2026-09-07 M:9 / W:37 394 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 56 P:0 / B:56 O:56 / B:0 0.031813 1.781512 Del
45 317 2026-09-07 M:9 / W:37 419 Shift A P2.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:3 / B:57 O:53 / B:0 0.031813 1.908763 Del
44 122 2026-09-07 M:9 / W:37 999 Shift A P2.CU.1 6.00 x 1220.00 x 2440.00 FA E2 BB CC 100 P:6 / B:94 O:94 / B:0 0.014884 1.488400 Del
42 188 2026-09-09 M:9 / W:37 302 Shift A P2.CU.2 9.00 x 1220.00 x 2440.00 FA E2 LKL UTY KRUING 49 P:1 / B:48 O:48 / B:0 0.025005 1.225251 Del