Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
543 727 2.40 915.00 1830.00 FM E1 UTY E 200 / 200
541 804 2.40 915.00 1830.00 FM E1 UTY E 200 / 200
540 731 2.40 915.00 1830.00 FM E1 UTY E 230 / 230
539 797//796 8.60 915.00 1830.00 MA B4 G1 40 / 40
538 795 8.20 915.00 1830.00 MA B4 G1 79 / 79
537 778//782 2.40 915.00 1830.00 FM E1 UTY E 232 / 232
536 904 2.40 915.00 1830.00 FM E1 UTY E 0 / 236
535 789 2.40 915.00 1830.00 FM E1 UTY E 0 / 204
534 823//821 8.60 1220.00 2440.00 MA B4 G1 21 / 72
533 777//776 15.00 1220.00 2440.00 FA B4 CI 17 41 / 41
Total: 521 data
< Prev Halaman 3 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
62 140 2026-09-07 M:9 / W:37 x Shift A P2.CU.2 3.70 x 1220.00 x 2440.00 FM B4 G1 67 P:16 / B:51 O:51 / B:116 0.009526 0.638226 Del
61 322 2026-09-07 M:9 / W:37 454 Shift B P2.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:4 / B:56 O:56 / B:0 0.031813 1.908763 Del
60 273 2026-09-07 M:9 / W:37 476 Shift A P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 16 P:0 / B:16 O:16 / B:15 0.041675 0.666803 Del
59 154 2026-09-07 M:9 / W:37 478//471 Shift A P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 50 P:0 / B:50 O:50 / B:0 0.041675 2.083760 Del
58 145 2026-09-07 M:9 / W:37 425 Shift A P2.CU.1 11.60 x 920.00 x 1830.00 MA B4 G1 59 P:0 / B:59 O:59 / B:0 0.017846 1.052923 Del
57 321 2026-09-07 M:9 / W:37 510 Shift A P2.CU.1 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:60 / B:0 0.017556 1.053343 Del
56 143 2026-09-07 M:9 / W:37 347 Shift A P2.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 64 P:0 / B:64 O:64 / B:0 0.031813 2.036014 Del
55 36 2026-09-01 M:9 / W:36 205 Shift A P2.CU.5 8.60 x 1230.00 x 2440.00 MA B4 G1 55 P:0 / B:55 O:25 / B:0 0.022809 1.254502 Del
54 285 2026-09-07 M:9 / W:37 430 Shift A P2.CU.1 11.60 x 1220.00 x 2440.00 FA B4 G2 51 P:3 / B:48 O:48 / B:0 0.031554 1.609258 Del
53 320 2026-09-07 M:9 / W:37 354 Shift A P2.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 40 P:4 / B:36 O:37 / B:0 0.031813 1.272509 Del