Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
475 765 14.60 915.00 1830.00 MA B4 G1 0 / 50
474 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 204
473 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
472 602 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
471 678 2.70 1220.00 2440.00 FA E1 UTY 0 / 163
470 780 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
469 722 14.60 915.00 1830.00 MA B4 G1 0 / 42
468 725//722 14.60 915.00 1830.00 MA B4 G1 0 / 43
467 634//725 14.60 915.00 1830.00 MA B4 G1 0 / 27
466 634 14.60 915.00 1830.00 MA B4 G1 0 / 42

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
208 193 2026-09-03 M:September / W:36 470//480 Shift B P1.CU.1 2.70 x 915.00 x 1830.00 FJB E1 UTY E 196 P:0 / B:196 O:0 / B:196 0.003684 0.722023 Del
207 192 2026-09-03 M:September / W:36 370//470 Shift A P1.CU.9 2.70 x 915.00 x 1830.00 FJB E1 UTY E 190 P:10 / B:180 O:0 / B:180 0.003684 0.699920 Del
206 191 2026-09-04 M:September / W:36 453/x Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.031813 1.908763 Del
205 190 2026-09-04 M:September / W:36 454//453 Shift B P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.031813 1.908763 Del
204 189 2026-09-03 M:September / W:36 454 Shift A P1.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:0 / B:60 O:60 / B:0 0.031813 1.908763 Del
203 188 2026-09-04 M:September / W:36 457 Shift A P1.CU.3 11.60 x 1230.00 x 2440.00 FA B4 G2 53 P:0 / B:53 O:0 / B:53 0.031813 1.686074 Del
202 187 2026-09-03 M:September / W:36 482 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:0 / B:200 O:0 / B:200 0.003181 0.636291 Del
201 186 2026-09-03 M:September / W:36 433 Shift B P1.CU.7 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:1 / B:199 O:0 / B:199 0.003181 0.636291 Del
200 185 2026-09-03 M:September / W:36 441 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:0 / B:200 O:0 / B:200 0.003181 0.636291 Del
199 184 2026-09-03 M:September / W:36 460 Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:0 / B:200 O:0 / B:200 0.003181 0.636291 Del