Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 74 | 124 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 73 | 135 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 72 | 126 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 71 | 125 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 70 | 115 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 69 | 121 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 68 | 339 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 203 | |
| 67 | x | 2.40 | 915.00 | 1830.00 | FM E1 UTY E | 0 / 44 | |
| 66 | 300 | 15.00 | 1220.00 | 2440.00 | FA B4 CI 17 | 0 / 50 | |
| 65 | 305 | 15.00 | 1220.00 | 2440.00 | FA B4 CI 17 | 0 / 50 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 198 | 183 | 2026-09-03 | M:September / W:36 | 399 | Shift B | P1.CU.7 | 2.70 x 915.00 x 1830.00 | FJB E1 UTY E | 206 | P:7 / B:199 | O:0 / B:199 | 0.003684 | 0.758861 | Del |
| 197 | 182 | 2026-09-03 | M:September / W:36 | 397 | Shift B | P1.CU.10 | 2.70 x 915.00 x 1830.00 | FJB E1 UTY E | 200 | P:8 / B:192 | O:0 / B:192 | 0.003684 | 0.736758 | Del |
| 196 | 181 | 2026-09-03 | M:September / W:36 | 398 | Shift B | P1.CU.8 | 2.70 x 915.00 x 1830.00 | FJB E1 UTY E | 200 | P:2 / B:198 | O:0 / B:198 | 0.003684 | 0.736758 | Del |
| 195 | 180 | 2026-09-03 | M:September / W:36 | 486 | Shift B | P1.CU.8 | 2.70 x 915.00 x 1830.00 | FJB E1 UTY E | 172 | P:0 / B:172 | O:0 / B:172 | 0.003684 | 0.633612 | Del |
| 194 | 179 | 2026-09-03 | M:September / W:36 | 1 | Shift A | P1.CU.8 | 14.60 x 1220.00 x 2440.00 | MA B4 G1 | 27 | P:0 / B:27 | O:0 / B:27 | 0.040484 | 1.093081 | Del |
| 193 | 178 | 2026-09-03 | M:September / W:36 | 301 | Shift B | P1.CU.2 | 18.00 x 1220.00 x 2440.00 | FM E2 LKL C11 7 | 8 | P:0 / B:8 | O:0 / B:8 | 0.050606 | 0.404845 | Del |
| 192 | 177 | 2026-09-10 | M:September / W:37 | x | Shift A | P1.CU.1 | 9.00 x 1220.00 x 2440.00 | FM E2 LKL C11 7 | 21 | P:0 / B:21 | O:0 / B:21 | 0.023814 | 0.500102 | Del |
| 191 | 176 | 2026-09-03 | M:September / W:36 | 961 | Shift B | P1.CU.7 | 9.00 x 1220.00 x 2440.00 | FA E2 BB CC | 70 | P:2 / B:68 | O:0 / B:68 | 0.023814 | 1.667008 | Del |
| 190 | 175 | 2026-09-03 | M:September / W:36 | 968 | Shift A | P1.CU.10 | 9.00 x 1220.00 x 2440.00 | FA E2 BB CC | 80 | P:0 / B:80 | O:0 / B:80 | 0.023814 | 1.905152 | Del |
| 189 | 174 | 2026-09-03 | M:September / W:36 | 430 | Shift A | P1.CU.9 | 11.60 x 1220.00 x 2440.00 | FA B4 G2 | 53 | P:2 / B:51 | O:0 / B:51 | 0.031554 | 1.672366 | Del |