Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 465 | 669 | 18.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 32 | |
| 464 | 688//687 | 6.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 115 | |
| 463 | 698//688 | 6.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 98 | |
| 462 | 698 | 6.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 50 | |
| 461 | 713 | 6.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 59 | |
| 460 | 714//713 | 6.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 74 | |
| 459 | 715//714 | 6.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 65 | |
| 458 | 715 | 6.00 | 1220.00 | 2440.00 | FA B4 BB CC | 50 / 50 | |
| 457 | 702//701 | 20.00 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 31 | |
| 456 | 461 | 15.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 50 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 168 | 151 | 2026-09-02 | M:September / W:36 | 263/x | Shift B | P1.CU.9 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 176 | P:3 / B:173 | O:0 / B:173 | 0.003181 | 0.559936 | Del |
| 167 | 150 | 2026-09-02 | M:September / W:36 | 317/x | Shift B | P1.CU.9 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 220 | P:4 / B:216 | O:0 / B:216 | 0.003181 | 0.699920 | Del |
| 166 | 149 | 2026-09-02 | M:September / W:36 | 431 | Shift B | P1.CU.9 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 200 | P:0 / B:200 | O:0 / B:200 | 0.003181 | 0.636291 | Del |
| 165 | 148 | 2026-09-02 | M:September / W:36 | 451/432 | Shift B | P1.CU.9 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 297 | P:5 / B:292 | O:0 / B:292 | 0.003181 | 0.944892 | Del |
| 164 | 147 | 2026-09-02 | M:September / W:36 | 452/451 | Shift B | P1.CU.9 | 2.40 x 915.00 x 1830.00 | FJB E1 UTY E | 205 | P:7 / B:198 | O:0 / B:198 | 0.003181 | 0.652198 | Del |
| 163 | 146 | 2026-09-02 | M:September / W:36 | 446 | Shift A | P1.CU.9 | 11.60 x 910.00 x 1820.00 | FA B4 G2 | 55 | P:0 / B:55 | O:0 / B:55 | 0.017556 | 0.965565 | Del |
| 162 | 145 | 2026-09-02 | M:September / W:36 | 409//329 | Shift A | P1.CU.9 | 17.60 x 1230.00 x 2440.00 | MA B4 G1 | 35 | P:0 / B:35 | O:0 / B:35 | 0.049820 | 1.743697 | Del |
| 161 | 144 | 2026-09-02 | M:September / W:36 | 328 | Shift A | P1.CU.1 | 17.60 x 1230.00 x 2440.00 | MA B4 G1 | 40 | P:0 / B:40 | O:0 / B:40 | 0.049820 | 1.992797 | Del |
| 160 | 143 | 2026-09-02 | M:September / W:36 | 230 | Shift A | P1.CU.10 | 18.00 x 1220.00 x 2440.00 | FM E2 LKL C11 7 | 30 | P:0 / B:30 | O:0 / B:30 | 0.050606 | 1.518168 | Del |
| 159 | 142 | 2026-09-02 | M:September / W:36 | 385 | Shift B | P1.CU.1 | 3.70 x 1230.00 x 2440.00 | FM B4 G1 | 200 | P:0 / B:200 | O:0 / B:200 | 0.009604 | 1.920768 | Del |