Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
114 129 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
113 8309 3.70 1220.00 2440.00 FM B4 G1 0 / 200
112 8303 3.70 1220.00 2440.00 FM B4 G1 0 / 200
111 8349 3.70 1220.00 2440.00 FM B4 G1 0 / 200
110 383 11.60 1230.00 2440.00 FA B4 G2 0 / 62
109 284 11.60 910.00 1820.00 FA B4 G2 0 / 60
108 285 11.60 910.00 1820.00 FA B4 G2 0 / 60
107 297 14.60 920.00 1830.00 MA B4 G1 0 / 30
106 298 14.60 920.00 1830.00 MA B4 G1 0 / 52
105 251/237 14.60 920.00 1830.00 MA B4 G1 0 / 33

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
168 151 2026-09-02 M:September / W:36 263/x Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 176 P:3 / B:173 O:0 / B:173 0.003181 0.559936 Del
167 150 2026-09-02 M:September / W:36 317/x Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 220 P:4 / B:216 O:0 / B:216 0.003181 0.699920 Del
166 149 2026-09-02 M:September / W:36 431 Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:0 / B:200 O:0 / B:200 0.003181 0.636291 Del
165 148 2026-09-02 M:September / W:36 451/432 Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 297 P:5 / B:292 O:0 / B:292 0.003181 0.944892 Del
164 147 2026-09-02 M:September / W:36 452/451 Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 205 P:7 / B:198 O:0 / B:198 0.003181 0.652198 Del
163 146 2026-09-02 M:September / W:36 446 Shift A P1.CU.9 11.60 x 910.00 x 1820.00 FA B4 G2 55 P:0 / B:55 O:0 / B:55 0.017556 0.965565 Del
162 145 2026-09-02 M:September / W:36 409//329 Shift A P1.CU.9 17.60 x 1230.00 x 2440.00 MA B4 G1 35 P:0 / B:35 O:0 / B:35 0.049820 1.743697 Del
161 144 2026-09-02 M:September / W:36 328 Shift A P1.CU.1 17.60 x 1230.00 x 2440.00 MA B4 G1 40 P:0 / B:40 O:0 / B:40 0.049820 1.992797 Del
160 143 2026-09-02 M:September / W:36 230 Shift A P1.CU.10 18.00 x 1220.00 x 2440.00 FM E2 LKL C11 7 30 P:0 / B:30 O:0 / B:30 0.050606 1.518168 Del
159 142 2026-09-02 M:September / W:36 385 Shift B P1.CU.1 3.70 x 1230.00 x 2440.00 FM B4 G1 200 P:0 / B:200 O:0 / B:200 0.009604 1.920768 Del