Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
559 870 11.60 915.00 1830.00 FA B4 G2 0 / 38
558 861//705 11.60 915.00 1830.00 FA B4 G2 0 / 60
557 842 11.60 915.00 1830.00 FA B4 G2 0 / 62
556 818 11.60 915.00 1830.00 FA B4 G2 0 / 60
555 860 11.60 915.00 1830.00 FA B4 G2 0 / 59
554 705 11.60 915.00 1830.00 FA B4 G2 0 / 43
553 844 11.60 915.00 1830.00 FA B4 G2 0 / 60
552 832 11.60 915.00 1830.00 FA B4 G2 0 / 60
551 833 11.60 915.00 1830.00 FA B4 G2 0 / 60
550 719 11.60 915.00 1830.00 FA B4 G2 60 / 60

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
172 155 2026-09-02 M:September / W:36 346 Shift A P1.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 31 P:0 / B:31 O:0 / B:31 0.058048 1.799476 Del
171 154 2026-09-02 M:September / W:36 378 Shift A P1.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 30 P:0 / B:30 O:0 / B:30 0.058048 1.741428 Del
170 153 2026-09-02 M:September / W:36 235 Shift B P1.CU.10 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:18 / B:182 O:0 / B:182 0.003181 0.636291 Del
169 152 2026-09-02 M:September / W:36 263/210 Shift B P1.CU.10 2.40 x 915.00 x 1830.00 FJB E1 UTY E 301 P:7 / B:294 O:0 / B:294 0.003181 0.957618 Del
168 151 2026-09-02 M:September / W:36 263/x Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 176 P:3 / B:173 O:0 / B:173 0.003181 0.559936 Del
167 150 2026-09-02 M:September / W:36 317/x Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 220 P:4 / B:216 O:0 / B:216 0.003181 0.699920 Del
166 149 2026-09-02 M:September / W:36 431 Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:0 / B:200 O:0 / B:200 0.003181 0.636291 Del
165 148 2026-09-02 M:September / W:36 451/432 Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 297 P:5 / B:292 O:0 / B:292 0.003181 0.944892 Del
164 147 2026-09-02 M:September / W:36 452/451 Shift B P1.CU.9 2.40 x 915.00 x 1830.00 FJB E1 UTY E 205 P:7 / B:198 O:0 / B:198 0.003181 0.652198 Del
163 146 2026-09-02 M:September / W:36 446 Shift A P1.CU.9 11.60 x 910.00 x 1820.00 FA B4 G2 55 P:0 / B:55 O:0 / B:55 0.017556 0.965565 Del