Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
274 458 11.60 910.00 1820.00 FA B4 G2 0 / 60
273 534 15.00 1220.00 2440.00 FA B4 CI 17 0 / 31
272 535//534 15.00 1220.00 2440.00 FA B4 CI 17 0 / 40
271 x 15.00 1220.00 2440.00 FA B4 BB CC LU DRI P 0 / 11
270 x 8.60 1230.00 2440.00 MA B4 LU DRI PTS P1+ 0 / 20
269 x 18.00 1220.00 2440.00 FA B4 BB CC LU DRI P 0 / 7
268 484 9.00 1220.00 2440.00 FA E2 LKL UTY KRUING 0 / 80
267 325 9.00 1220.00 2440.00 FA E2 BB CC 0 / 80
266 542 5.00 1220.00 2440.00 FA E2 CI D2 0 / 100
265 502 5.00 1220.00 2440.00 FA E2 CI D2 0 / 100

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
148 131 2026-09-01 M:September / W:36 804 Shift A P1.CU.3 20.50 x 915.00 x 1830.00 MA B4 G1 30 P:0 / B:30 O:0 / B:30 0.032652 0.979553 Del
147 130 2026-09-01 M:September / W:36 359 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
146 129 2026-08-31 M:Agustus / W:36 381 Shift B P1.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
145 128 2026-09-01 M:September / W:36 408 Shift A P1.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
144 127 2026-09-01 M:September / W:36 407 Shift B P1.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
143 126 2026-09-01 M:September / W:36 386 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
142 125 2026-08-31 M:Agustus / W:36 387 Shift B P1.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
141 124 2026-09-01 M:September / W:36 50 Shift B P1.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
140 123 2026-09-01 M:September / W:36 375 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
139 122 2026-09-01 M:September / W:36 230 Shift A P1.CU.2 18.00 x 1220.00 x 2440.00 FM E2 LKL C11 7 19 P:0 / B:19 O:0 / B:19 0.050606 0.961506 Del