Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 184 | 460 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 183 | 399 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 206 | |
| 182 | 397 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 181 | 398 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 180 | 486 | 2.70 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 172 | |
| 179 | 1 | 14.60 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 27 | |
| 178 | 301 | 18.00 | 1220.00 | 2440.00 | FM E2 LKL C11 7 | 0 / 8 | |
| 177 | x | 9.00 | 1220.00 | 2440.00 | FM E2 LKL C11 7 | 0 / 21 | |
| 176 | 961 | 9.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 70 | |
| 175 | 968 | 9.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 80 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 148 | 131 | 2026-09-01 | M:September / W:36 | 804 | Shift A | P1.CU.3 | 20.50 x 915.00 x 1830.00 | MA B4 G1 | 30 | P:0 / B:30 | O:0 / B:30 | 0.032652 | 0.979553 | Del |
| 147 | 130 | 2026-09-01 | M:September / W:36 | 359 | Shift A | P1.CU.1 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 146 | 129 | 2026-08-31 | M:Agustus / W:36 | 381 | Shift B | P1.CU.2 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 145 | 128 | 2026-09-01 | M:September / W:36 | 408 | Shift A | P1.CU.2 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 144 | 127 | 2026-09-01 | M:September / W:36 | 407 | Shift B | P1.CU.2 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 143 | 126 | 2026-09-01 | M:September / W:36 | 386 | Shift A | P1.CU.1 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 142 | 125 | 2026-08-31 | M:Agustus / W:36 | 387 | Shift B | P1.CU.2 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 141 | 124 | 2026-09-01 | M:September / W:36 | 50 | Shift B | P1.CU.1 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 140 | 123 | 2026-09-01 | M:September / W:36 | 375 | Shift A | P1.CU.1 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 139 | 122 | 2026-09-01 | M:September / W:36 | 230 | Shift A | P1.CU.2 | 18.00 x 1220.00 x 2440.00 | FM E2 LKL C11 7 | 19 | P:0 / B:19 | O:0 / B:19 | 0.050606 | 0.961506 | Del |