Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
154 378 20.50 1220.00 2440.00 MA B4 G1 0 / 30
153 235 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
152 263/210 2.40 915.00 1830.00 FJB E1 UTY E 0 / 301
151 263/x 2.40 915.00 1830.00 FJB E1 UTY E 0 / 176
150 317/x 2.40 915.00 1830.00 FJB E1 UTY E 0 / 220
149 431 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
148 451/432 2.40 915.00 1830.00 FJB E1 UTY E 0 / 297
147 452/451 2.40 915.00 1830.00 FJB E1 UTY E 0 / 205
146 446 11.60 910.00 1820.00 FA B4 G2 0 / 55
145 409//329 17.60 1230.00 2440.00 MA B4 G1 0 / 35

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
148 131 2026-09-01 M:September / W:36 804 Shift A P1.CU.3 20.50 x 915.00 x 1830.00 MA B4 G1 30 P:0 / B:30 O:0 / B:30 0.032652 0.979553 Del
147 130 2026-09-01 M:September / W:36 359 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
146 129 2026-08-31 M:Agustus / W:36 381 Shift B P1.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
145 128 2026-09-01 M:September / W:36 408 Shift A P1.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
144 127 2026-09-01 M:September / W:36 407 Shift B P1.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
143 126 2026-09-01 M:September / W:36 386 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
142 125 2026-08-31 M:Agustus / W:36 387 Shift B P1.CU.2 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
141 124 2026-09-01 M:September / W:36 50 Shift B P1.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
140 123 2026-09-01 M:September / W:36 375 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del
139 122 2026-09-01 M:September / W:36 230 Shift A P1.CU.2 18.00 x 1220.00 x 2440.00 FM E2 LKL C11 7 19 P:0 / B:19 O:0 / B:19 0.050606 0.961506 Del