Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 54 | 314 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 200 | |
| 53 | 110 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 199 | |
| 52 | 236 | 2.40 | 915.00 | 1830.00 | FJB E1 UTY E | 0 / 198 | |
| 51 | 303 | 2.70 | 1220.00 | 2440.00 | FA E2 D1 D2 | 139 / 139 | |
| 50 | 10 | 6.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 93 | |
| 49 | 170//199 | 11.60 | 1230.00 | 2440.00 | MA B4 G1 | 60 / 60 | |
| 48 | 170 | 11.60 | 1230.00 | 2440.00 | MA B4 G1 | 60 / 60 | |
| 47 | 205 | 8.60 | 1230.00 | 2440.00 | MA B4 G1 | 55 / 55 | |
| 46 | 298 | 14.60 | 1230.00 | 2440.00 | MA B4 G1 | 50 / 50 | |
| 45 | 940 | 8.20 | 1220.00 | 2440.00 | FM E1 BB CC | 50 / 50 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 148 | 131 | 2026-09-01 | M:September / W:36 | 804 | Shift A | P1.CU.3 | 20.50 x 915.00 x 1830.00 | MA B4 G1 | 30 | P:0 / B:30 | O:0 / B:30 | 0.032652 | 0.979553 | Del |
| 147 | 130 | 2026-09-01 | M:September / W:36 | 359 | Shift A | P1.CU.1 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 146 | 129 | 2026-08-31 | M:Agustus / W:36 | 381 | Shift B | P1.CU.2 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 145 | 128 | 2026-09-01 | M:September / W:36 | 408 | Shift A | P1.CU.2 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 144 | 127 | 2026-09-01 | M:September / W:36 | 407 | Shift B | P1.CU.2 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 143 | 126 | 2026-09-01 | M:September / W:36 | 386 | Shift A | P1.CU.1 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 142 | 125 | 2026-08-31 | M:Agustus / W:36 | 387 | Shift B | P1.CU.2 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 141 | 124 | 2026-09-01 | M:September / W:36 | 50 | Shift B | P1.CU.1 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 140 | 123 | 2026-09-01 | M:September / W:36 | 375 | Shift A | P1.CU.1 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 139 | 122 | 2026-09-01 | M:September / W:36 | 230 | Shift A | P1.CU.2 | 18.00 x 1220.00 x 2440.00 | FM E2 LKL C11 7 | 19 | P:0 / B:19 | O:0 / B:19 | 0.050606 | 0.961506 | Del |