Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
156 336 2.70 915.00 1830.00 FJB E1 UTY E 0 / 200
155 346 20.50 1220.00 2440.00 MA B4 G1 0 / 31
154 378 20.50 1220.00 2440.00 MA B4 G1 0 / 30
153 235 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
152 263/210 2.40 915.00 1830.00 FJB E1 UTY E 0 / 301
151 263/x 2.40 915.00 1830.00 FJB E1 UTY E 0 / 176
150 317/x 2.40 915.00 1830.00 FJB E1 UTY E 0 / 220
149 431 2.40 915.00 1830.00 FJB E1 UTY E 0 / 200
148 451/432 2.40 915.00 1830.00 FJB E1 UTY E 0 / 297
147 452/451 2.40 915.00 1830.00 FJB E1 UTY E 0 / 205

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
162 145 2026-09-02 M:September / W:36 409//329 Shift A P1.CU.9 17.60 x 1230.00 x 2440.00 MA B4 G1 35 P:0 / B:35 O:0 / B:35 0.049820 1.743697 Del
161 144 2026-09-02 M:September / W:36 328 Shift A P1.CU.1 17.60 x 1230.00 x 2440.00 MA B4 G1 40 P:0 / B:40 O:0 / B:40 0.049820 1.992797 Del
160 143 2026-09-02 M:September / W:36 230 Shift A P1.CU.10 18.00 x 1220.00 x 2440.00 FM E2 LKL C11 7 30 P:0 / B:30 O:0 / B:30 0.050606 1.518168 Del
159 142 2026-09-02 M:September / W:36 385 Shift B P1.CU.1 3.70 x 1230.00 x 2440.00 FM B4 G1 200 P:0 / B:200 O:0 / B:200 0.009604 1.920768 Del
158 141 2026-09-02 M:September / W:36 254 Shift A P1.CU.1 3.70 x 1230.00 x 2440.00 FM B4 G1 200 P:0 / B:200 O:0 / B:200 0.009604 1.920768 Del
157 140 2026-09-01 M:September / W:36 147 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:0 / B:200 O:0 / B:200 0.003181 0.636291 Del
156 139 2026-09-01 M:September / W:36 181 Shift A P1.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:1 / B:199 O:0 / B:199 0.003181 0.636291 Del
155 138 2026-09-02 M:September / W:36 8308 Shift A P1.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 200 P:0 / B:200 O:0 / B:200 0.009604 1.920768 Del
154 137 2026-09-01 M:September / W:36 374 Shift B P1.CU.1 14.60 x 915.00 x 1830.00 MA B4 G1 37 P:2 / B:35 O:0 / B:35 0.022773 0.842583 Del
153 136 2026-09-02 M:September / W:36 403 Shift A P1.CU.2 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017749 1.064950 Del