Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
455 734 14.60 915.00 1830.00 MA B4 G1 37 / 37
454 766 14.60 915.00 1830.00 MA B4 G1 0 / 34
453 725//722 14.60 915.00 1830.00 MA B4 G1 42 / 42
452 243 5.00 915.00 1830.00 FM E2 CI 17 53 / 53
451 662 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 46
450 838 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
449 816 2.70 1220.00 2440.00 FA E1 UTY 0 / 258
448 461 15.00 1220.00 2440.00 FA B4 BB CC 43 / 43
447 799 15.00 1220.00 2440.00 FA B4 CI 17 44 / 50
446 827 2.40 1220.00 2440.00 FA E1 UTY E 0 / 242
Total: 521 data
< Prev Halaman 11 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
542 465 2026-09-16 M:9 / W:38 784 Shift B P2.CU.5 2.40 x 915.00 x 1830.00 FM E1 UTY E 72 P:0 / B:72 O:0 / B:127 0.003181 0.229065 Del
541 463 2026-09-16 M:9 / W:38 748 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:11 / B:189 O:0 / B:0 0.006549 1.309792 Del
540 462 2026-09-16 M:9 / W:38 490 Shift B P2.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:8 / B:192 O:0 / B:0 0.006549 1.309792 Del
539 461 2026-09-16 M:9 / W:38 581 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:7 / B:193 O:0 / B:0 0.006549 1.309792 Del
538 450 2026-09-16 M:9 / W:38 838 Shift B P2.CU.4 2.70 x 1220.00 x 2440.00 FA E1 UTY 144 P:2 / B:142 O:0 / B:56 0.006549 0.943050 Del
537 460 2026-09-16 M:9 / W:38 842 Shift B P2.CU.4 18.00 x 1220.00 x 2440.00 FA E1 UTY 21 P:0 / B:21 O:0 / B:0 0.050606 1.062718 Del
535 459 2026-09-16 M:9 / W:38 x Shift B P2.CU.4 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:48 / B:152 O:0 / B:0 0.006549 1.309792 Del
532 456 2026-09-16 M:9 / W:38 496 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 226 P:49 / B:177 O:0 / B:0 0.006549 1.480065 Del
530 310 2026-09-16 M:9 / W:38 634 Shift B P2.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 27 P:1 / B:26 O:0 / B:15 0.022773 0.614858 Del
528 454 2026-09-16 M:9 / W:38 766 Shift B P2.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 34 P:0 / B:34 O:0 / B:0 0.022773 0.774266 Del