Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
347 8384 3.70 1230.00 2440.00 FM B4 G1 42 / 199
346 358/353 17.60 1230.00 2440.00 MA B4 G1 0 / 40
345 409 17.60 1230.00 2440.00 MA B4 G1 36 / 36
344 379 20.50 1220.00 2440.00 MA B4 G1 0 / 30
343 417//377 20.50 1220.00 2440.00 MA B4 G1 0 / 35
342 376 20.50 1220.00 2440.00 MA B4 G1 0 / 30
341 X 14.60 1220.00 2440.00 MA B4 G1 21 / 50
340 350 20.50 1220.00 2440.00 MA B4 G1 35 / 35
339 417 20.50 1220.00 2440.00 MA B4 G1 31 / 31
338 x 8.60 915.00 1830.00 MA B4 G2 0 / 7
Total: 536 data
< Prev Halaman 23 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
549 472 2026-09-26 M:9 / W:39 752 Shift B P2.CU.4 2.40 x 915.00 x 1830.00 FM E1 UTY E 200 P:3 / B:197 O:0 / B:0 0.003181 0.636291 Del
547 465 2026-09-17 M:9 / W:38 784 Shift A P2.CU.4 2.40 x 915.00 x 1830.00 FM E1 UTY E 127 P:17 / B:110 O:0 / B:72 0.003181 0.404045 Del
544 467 2026-09-16 M:9 / W:38 745 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FM E1 UTY E 200 P:13 / B:187 O:0 / B:0 0.003181 0.636291 Del
543 466 2026-09-16 M:9 / W:38 698 Shift A P2.CU.3 6.00 x 1220.00 x 2440.00 FA B4 BB CC 50 P:4 / B:46 O:0 / B:0 0.014884 0.744200 Del
542 465 2026-09-16 M:9 / W:38 784 Shift B P2.CU.5 2.40 x 915.00 x 1830.00 FM E1 UTY E 72 P:0 / B:72 O:0 / B:127 0.003181 0.229065 Del
541 463 2026-09-16 M:9 / W:38 748 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:11 / B:189 O:0 / B:0 0.006549 1.309792 Del
540 462 2026-09-16 M:9 / W:38 490 Shift B P2.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:8 / B:192 O:0 / B:0 0.006549 1.309792 Del
539 461 2026-09-16 M:9 / W:38 581 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:7 / B:193 O:0 / B:0 0.006549 1.309792 Del
538 450 2026-09-16 M:9 / W:38 838 Shift B P2.CU.4 2.70 x 1220.00 x 2440.00 FA E1 UTY 144 P:2 / B:142 O:0 / B:56 0.006549 0.943050 Del
537 460 2026-09-16 M:9 / W:38 842 Shift B P2.CU.4 18.00 x 1220.00 x 2440.00 FA E1 UTY 21 P:0 / B:21 O:0 / B:0 0.050606 1.062718 Del