Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
384 622 2.70 1220.00 2440.00 FA E1 UTY 0 / 202
383 621 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
382 641 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
381 498 20.50 1220.00 2440.00 MA B4 G1 0 / 20
380 60 18.00 1220.00 2440.00 FM E1 UTY E 0 / 12
379 x 14.60 1220.00 2440.00 MA B4 G1 0 / 50
378 628 14.60 1220.00 2440.00 MA B4 G1 0 / 35
377 636//628 14.60 1220.00 2440.00 MA B4 G1 0 / 40
376 x 17.60 915.00 1830.00 MA B4 G2 0 / 3
375 x 20.50 915.00 1830.00 MA B4 G2 0 / 3

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
675 538 2026-09-18 M:9 / W:38 650 Shift A P1.CU.3 18.00 x 1220.00 x 2440.00 FA B4 CI 17 25 P:0 / B:25 O:25 / B:0 0.050606 1.265140 Del
674 533 2026-09-18 M:9 / W:38 631 Shift A P1.CU.2 17.60 x 1220.00 x 2440.00 FA B4 CI 17 39 P:0 / B:39 O:39 / B:0 0.049415 1.927180 Del
673 536 2026-09-18 M:9 / W:38 740 Shift A P1.CU.9 15.00 x 1220.00 x 0.00 FA B4 CI 17 32 P:0 / B:32 O:32 / B:0 0.000000 0.000000 Del
672 534 2026-09-18 M:9 / W:38 777//776 Shift A P1.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 41 P:0 / B:41 O:35 / B:6 0.041675 1.708683 Del
671 681 2026-09-18 M:9 / W:38 x Shift A P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 12 P:0 / B:12 O:12 / B:0 0.041675 0.500102 Del
670 535 2026-09-18 M:9 / W:38 776 Shift A P1.CU.4 15.00 x 1220.00 x 2440.00 FA B4 CI 17 27 P:0 / B:27 O:27 / B:0 0.041675 1.125230 Del
669 680 2026-09-18 M:9 / W:38 821 Shift B P1.CU.2 8.60 x 1220.00 x 2440.00 MA B4 G1 67 P:2 / B:65 O:65 / B:0 0.022624 1.515787 Del
668 674 2026-09-18 M:9 / W:38 197 Shift B P1.CU.3 15.00 x 1220.00 x 2440.00 FM B4 BB CC 58 P:12 / B:46 O:0 / B:46 0.041675 2.417162 Del
667 673 2026-09-18 M:9 / W:38 x//917//913 Shift B P1.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 44 P:0 / B:44 O:44 / B:0 0.022773 1.001991 Del
666 671 2026-09-18 M:9 / W:38 850//873 Shift B P1.CU.3 14.60 x 915.00 x 1830.00 MA B4 G1 50 P:8 / B:42 O:42 / B:0 0.022773 1.138626 Del