Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
700 923 11.60 1220.00 2440.00 MA B4 G1 0 / 53
699 957 15.00 1220.00 2440.00 FA B4 CI 17 0 / 35
698 924 11.60 1220.00 2440.00 MA B4 G1 0 / 60
697 853 11.60 915.00 1830.00 MA B4 G1 0 / 60
696 862 8.60 915.00 1830.00 MA B4 G1 70 / 70
695 863 8.60 915.00 1830.00 MA B4 G1 0 / 107
694 x 11.60 915.00 1830.00 MA B4 G1 0 / 60
693 854 11.60 915.00 1830.00 MA B4 G1 0 / 60
692 868 8.60 915.00 1830.00 MA B4 G1 0 / 94
691 x 15.00 1220.00 2440.00 FA B4 CI 17 0 / 38

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
675 538 2026-09-18 M:9 / W:38 650 Shift A P1.CU.3 18.00 x 1220.00 x 2440.00 FA B4 CI 17 25 P:0 / B:25 O:25 / B:0 0.050606 1.265140 Del
674 533 2026-09-18 M:9 / W:38 631 Shift A P1.CU.2 17.60 x 1220.00 x 2440.00 FA B4 CI 17 39 P:0 / B:39 O:39 / B:0 0.049415 1.927180 Del
673 536 2026-09-18 M:9 / W:38 740 Shift A P1.CU.9 15.00 x 1220.00 x 0.00 FA B4 CI 17 32 P:0 / B:32 O:32 / B:0 0.000000 0.000000 Del
672 534 2026-09-18 M:9 / W:38 777//776 Shift A P1.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 41 P:0 / B:41 O:35 / B:6 0.041675 1.708683 Del
671 681 2026-09-18 M:9 / W:38 x Shift A P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 12 P:0 / B:12 O:12 / B:0 0.041675 0.500102 Del
670 535 2026-09-18 M:9 / W:38 776 Shift A P1.CU.4 15.00 x 1220.00 x 2440.00 FA B4 CI 17 27 P:0 / B:27 O:27 / B:0 0.041675 1.125230 Del
669 680 2026-09-18 M:9 / W:38 821 Shift B P1.CU.2 8.60 x 1220.00 x 2440.00 MA B4 G1 67 P:2 / B:65 O:65 / B:0 0.022624 1.515787 Del
668 674 2026-09-18 M:9 / W:38 197 Shift B P1.CU.3 15.00 x 1220.00 x 2440.00 FM B4 BB CC 58 P:12 / B:46 O:0 / B:46 0.041675 2.417162 Del
667 673 2026-09-18 M:9 / W:38 x//917//913 Shift B P1.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 44 P:0 / B:44 O:44 / B:0 0.022773 1.001991 Del
666 671 2026-09-18 M:9 / W:38 850//873 Shift B P1.CU.3 14.60 x 915.00 x 1830.00 MA B4 G1 50 P:8 / B:42 O:42 / B:0 0.022773 1.138626 Del