Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
597 642 11.00 1220.00 2440.00 FM E1 UTY E 0 / 2
596 497 3.00 1220.00 2440.00 FM E1 UTY E 0 / 4
595 664 11.60 1220.00 2440.00 MA B4 G1 0 / 63
594 63 15.00 1220.00 2440.00 FA B4 BB CC 0 / 50
593 597 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 108
592 471//476 15.00 1220.00 2440.00 FA B4 CI 17 0 / 50
591 130 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 95
590 120 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 101
589 95 5.00 915.00 1830.00 FA E2 UTY KRUING 0 / 101
588 94 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 101

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
128 111 2026-09-01 M:September / W:36 8349 Shift A P1.CU.2 3.70 x 1220.00 x 2440.00 FM B4 G1 200 P:2 / B:198 O:0 / B:198 0.009526 1.905152 Del
127 110 2026-09-01 M:September / W:36 383 Shift B P1.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 62 P:0 / B:62 O:0 / B:62 0.031813 1.972389 Del
126 109 2026-09-01 M:September / W:36 284 Shift A P1.CU.1 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017556 1.053343 Del
125 108 2026-09-01 M:September / W:36 285 Shift A P1.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017556 1.053343 Del
124 107 2026-09-01 M:September / W:36 297 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 30 P:0 / B:30 O:0 / B:30 0.022897 0.686909 Del
123 106 2026-09-01 M:September / W:36 298 Shift B P1.CU.2 14.60 x 920.00 x 1830.00 MA B4 G1 52 P:0 / B:52 O:0 / B:52 0.022897 1.190642 Del
122 105 2026-09-01 M:September / W:36 251/237 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 33 P:0 / B:33 O:0 / B:33 0.022897 0.755600 Del
121 104 2026-09-01 M:September / W:36 251 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:0 / B:50 0.022897 1.144848 Del
120 103 2026-09-01 M:September / W:36 371 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:0 / B:50 0.022897 1.144848 Del
119 102 2026-09-01 M:September / W:36 382 Shift A P1.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 22 P:0 / B:22 O:0 / B:22 0.041675 0.916854 Del